Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 106
Message text: There are no assignments from selected PS text to a &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN106
- There are no assignments from selected PS text to a &1 ?The SAP error message CN106 ("There are no assignments from selected PS text to a &1") typically occurs in the context of Project System (PS) when you are trying to assign a project text to a project element (like a WBS element or network) but there are no existing assignments for the selected text.
Cause:
- No Existing Text Assignment: The most common cause of this error is that the text you are trying to assign does not have any existing assignments to the specified project element.
- Incorrect Selection: You may have selected a project element that does not have any texts assigned to it.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or assign texts to the project element.
- Configuration Issues: There may be configuration settings in the system that prevent the assignment of texts to certain project elements.
Solution:
- Check Text Assignments: Verify if the text you are trying to assign is indeed assigned to the project element. You can do this by navigating to the relevant project element and checking its text assignments.
- Create New Text Assignment: If there are no existing assignments, you may need to create a new text assignment for the project element. This can usually be done in the project management transaction (like CJ20N) by selecting the project element and adding the text.
- Review Authorizations: Ensure that you have the necessary authorizations to assign texts to the project element. If not, contact your SAP security administrator.
- Consult Configuration: If you suspect a configuration issue, consult with your SAP Basis or configuration team to ensure that the system is set up correctly for text assignments in the Project System.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CN105
Invalid text key
What causes this issue? An invalid parameter was set by the system for the text identifier when the PS texts were called up.System Response INCLUDE ...
CN104
No entry for selection
What causes this issue? You haven't entered any data for the PS text catalog.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT ...
CN107
No assignments from selected PS text to a network exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN108
No assignments from selected PS text to a standard network exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...