Message text: No costs were calculated for the activity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN095
- No costs were calculated for the activity ?The SAP error message CN095 ("No costs were calculated for the activity") typically occurs in the context of project management and controlling within SAP, particularly when dealing with activities in a project or internal order. This error indicates that the system was unable to calculate costs for a specific activity, which can be due to several reasons.
Causes:
- Missing Cost Elements: The activity may not have any cost elements assigned to it, which are necessary for cost calculation.
- No Actual Data: There may be no actual data (e.g., labor hours, materials) recorded against the activity, preventing cost calculation.
- Incorrect Activity Type: The activity type assigned may not be configured correctly or may not have a valid cost structure.
- Cost Planning Issues: If the activity has not been planned correctly or if the planning data is missing, costs cannot be calculated.
- Status of the Activity: The activity might be in a status that does not allow for cost calculation (e.g., closed or completed).
- Configuration Issues: There may be issues with the configuration of the controlling area, activity types, or cost centers.
Solutions:
- Check Cost Elements: Ensure that the activity has the necessary cost elements assigned. You can do this by reviewing the activity type configuration.
- Enter Actual Data: Make sure that actual data (e.g., time confirmations, material usage) is recorded against the activity.
- Review Activity Type Configuration: Verify that the activity type is set up correctly in the system and that it has a valid cost structure.
- Check Planning Data: Ensure that the planning data for the activity is complete and accurate. If necessary, re-plan the activity.
- Review Activity Status: Check the status of the activity to ensure it is open and available for cost calculation.
- Consult Configuration Settings: If you suspect configuration issues, consult with your SAP configuration team to review the settings for the controlling area, activity types, and cost centers.
Related Information:
CJ20N
(Project Builder) or CJI3
(Project Actual Line Items) to review project activities and their associated costs.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project System (PS) or Controlling (CO) modules.
Get instant SAP help. Start your 7-day free trial now.
CN094
The network for activity & could not be found
What causes this issue? A unit cost estimate could not be created for activity &V&, because no network could be found for this activity.Error...
CN093
Unit costing is only possible for primary cost activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN096
*************** PS Texts **********************************************
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN097
WBS element & is marked for deletion
What causes this issue? The WBS element &V1& has been marked for deletion. You cannot assign any more texts to the WBS element.System Respons...