How To Fix CMT089 - Baseline is frozen, changes not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CMT - CM: Message Class in CM Environment

  • Message number: 089

  • Message text: Baseline is frozen, changes not possible

  • Show details Hide details
  • What causes this issue?

    This Baseline has the system status "Baseline" and is locked against
    changes.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CMT089 - Baseline is frozen, changes not possible ?

    The SAP error message CMT089, which states "Baseline is frozen, changes not possible," typically occurs in the context of project management or configuration management within SAP systems, particularly in the Project System (PS) or Change Management modules. This error indicates that the baseline for a project or configuration has been locked or frozen, preventing any modifications.

    Cause:

    1. Frozen Baseline: The baseline has been set and frozen to ensure that the original project plan or configuration is preserved. This is often done to maintain a reference point for performance measurement and reporting.
    2. Project Status: The project or configuration might be in a status that does not allow changes, such as "Completed" or "Closed."
    3. Authorization Issues: The user may not have the necessary permissions to make changes to the baseline.
    4. System Configuration: Certain system settings or configurations may prevent changes to a frozen baseline.

    Solution:

    1. Unfreeze the Baseline: If you have the necessary permissions, you can unfreeze the baseline. This typically involves navigating to the project or configuration management area and changing the status of the baseline.
      • In the Project System, you can use transaction codes like CJ20N (Project Builder) to access the project and modify the baseline status.
    2. Change Project Status: If the project is in a status that prevents changes, consider changing the status to allow modifications. This may require specific authorizations.
    3. Check Authorizations: Ensure that you have the appropriate authorizations to make changes to the baseline. If not, contact your SAP security administrator to request the necessary permissions.
    4. Consult Documentation: Review the project management or configuration management documentation for your organization to understand the policies regarding baselines and changes.
    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting SAP Notes for any known issues or patches related to this error.

    Related Information:

    • SAP Notes: Check SAP Notes for any specific guidance or updates related to error CMT089. SAP Notes often provide solutions or workarounds for known issues.
    • Project Management Best Practices: Familiarize yourself with best practices in project management within SAP, including how to handle baselines and project statuses.
    • Training: Consider training sessions or workshops on SAP Project System or Change Management to better understand how to manage baselines and project configurations effectively.

    By following these steps, you should be able to address the CMT089 error and manage your project or configuration baselines more effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant