Do you have any question about this error?
Message type: E = Error
Message class: CMCL - Service layer for component allocations
Message number: 108
Message text: An item cannot be assigned to a dummy operation
You want to assign items to an operation that references a reference
operation set or reference rate routing. This is not possible.
The component assignment was not created.
Assign the items that you want to assign to a reference operation set
(or reference rate routing) to the operations of the reference
operation set (or reference rate routing).
Error message extract from SAP system. Copyright SAP SE.
CMCL108
- An item cannot be assigned to a dummy operation ?The SAP error message CMCL108 ("An item cannot be assigned to a dummy operation") typically occurs in the context of production planning or process management within SAP. This error indicates that there is an attempt to assign a material or item to a "dummy operation" in a routing or production order, which is not allowed.
Cause:
- Dummy Operation: A dummy operation is a placeholder in a routing that does not perform any actual work. It is often used for organizational purposes or to represent a step that does not require any resources or time.
- Incorrect Assignment: The error arises when there is an attempt to assign a material or component to this dummy operation, which is not valid since dummy operations do not consume materials or have any associated costs.
Solution:
- Review the Routing: Check the routing associated with the production order or process. Identify the dummy operation and ensure that no materials are assigned to it.
- Reassign Materials: If materials are incorrectly assigned to the dummy operation, reassign them to the appropriate operations that actually perform work and consume materials.
- Modify the Dummy Operation: If the dummy operation is necessary for your process, ensure that it is correctly configured and that no materials are linked to it.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on how to manage routings and operations effectively.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), or CO01
(Create Production Order) to review and modify routings and production orders.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CMCL107
Operation cannot be locked (lock management error)
INCLUDE NA_OBJ_ANLSPERRV OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
CMCL106
Operation &1 has been locked by &2
What causes this issue? You want to edit operation &V1& which has, however, been locked by user &V2&.System Response The component a...
CMCL110
Component assignement not valid on key date
INCLUDE NA_OBJ_STICHUN OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
CMCL111
Delete existing component assignment first
What causes this issue? You want to reassign an existing generic component assignement to an operation that is not a group operation. You can only do...
Click on this link to search all SAP messages.