Do you have any question about this error?
Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 133
Message text: Component is assigned from &1 to operation &2 in sequence &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CM133
- Component is assigned from &1 to operation &2 in sequence &3 ?The SAP error message CM133 indicates that a component is assigned to an operation in a sequence, but there is an issue with the assignment. This error typically arises in the context of production planning and control, particularly when dealing with production orders, routing, or work center assignments.
Cause:
The error message CM133 can occur due to several reasons, including:
- Incorrect Assignment: The component may not be correctly assigned to the operation in the routing or production order.
- Sequence Issues: The component might be assigned to a different operation or sequence than intended.
- Routing Configuration: There may be inconsistencies in the routing configuration, such as missing or incorrect data.
- Master Data Issues: Problems with master data, such as incorrect material master records or BOM (Bill of Materials) configurations, can lead to this error.
- Status of the Order: The production order may be in a status that does not allow changes to component assignments.
Solution:
To resolve the CM133 error, you can take the following steps:
Check the Routing: Verify the routing for the production order and ensure that the component is correctly assigned to the intended operation. You can do this by navigating to the routing in the SAP system and reviewing the operation assignments.
Review the Production Order: Check the production order for any discrepancies in the component assignments. Ensure that the components are assigned to the correct operations and sequences.
Update Master Data: If there are issues with the master data (e.g., BOM or material master), correct any inconsistencies. Ensure that the BOM is correctly defined and that the components are available for the production order.
Change Order Status: If the production order is in a status that restricts changes, you may need to change the status to allow for modifications. This may involve setting the order to a status that permits editing.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CO02
(Change Production Order) or CA03
(Display Routing) to investigate and make necessary changes.By following these steps, you should be able to identify and resolve the underlying issue causing the CM133 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CM132
Enter all data on this selection screen!
What causes this issue? You have to maintain all the data in this CATT selection screen. If you do not want to do this (perhaps you do not have all t...
CM131
New bill of material items automatically allocated to operation &1
System Response All items that you create in the BOM will be allocated to the current operation &v1&, when you return to the component overvi...
CM200
Select bill of material item first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM201
No component allocation has been selected (please check).
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.