Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CKCC - Messages in the Costing Run Cockpit
Message number: 059
Message text: Start date for the next costing run is invalid.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKCC059
- Start date for the next costing run is invalid. ?The SAP error message CKCC059, which states "Start date for the next costing run is invalid," typically occurs in the context of product costing in SAP. This error indicates that the date set for the next costing run is not valid, which can prevent the costing process from proceeding.
Causes:
- Invalid Date Format: The date entered may not conform to the expected format or may be outside the acceptable range.
- Date in the Past: The start date for the next costing run may be set to a date that has already passed.
- System Settings: The system may have specific settings or configurations that restrict the dates that can be used for costing runs.
- Fiscal Year Settings: The date may fall outside the defined fiscal year or period settings in the system.
- User Authorization: The user may not have the necessary permissions to set or modify the costing run dates.
Solutions:
- Check Date Format: Ensure that the date is entered in the correct format as per the system's requirements.
- Set Future Date: Change the start date for the next costing run to a future date that is valid and within the acceptable range.
- Review System Settings: Consult with your SAP administrator to review any system settings that may affect the costing run dates.
- Verify Fiscal Year Settings: Check the fiscal year and period settings in the system to ensure that the date falls within an open period.
- User Permissions: Ensure that the user has the necessary authorizations to perform the costing run and modify the dates.
Related Information:
By addressing the above points, you should be able to resolve the CKCC059 error and successfully set up your next costing run.
Get instant SAP help. Sign up for our Free Essentials Plan.
CKCC058
Start time for the next costing run is invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKCC057
Next costing run &1 of &2 has been created already
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKCC060
No parameters maintained for step &1 of costing run &2 from &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKCC061
Job &1 successfully scheduled for user &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.