How To Fix CK876 - Use PLANNED_PRICE_ADDITIONS only with planned prices


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 876

  • Message text: Use PLANNED_PRICE_ADDITIONS only with planned prices

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK876 - Use PLANNED_PRICE_ADDITIONS only with planned prices ?

    The SAP error message CK876 ("Use PLANNED_PRICE_ADDITIONS only with planned prices") typically occurs in the context of product costing, particularly when dealing with planned prices in the Material Ledger or Costing module. This error indicates that there is an attempt to use the "PLANNED_PRICE_ADDITIONS" functionality without having a planned price set for the material.

    Cause:

    1. Missing Planned Price: The primary cause of this error is that the material in question does not have a planned price defined in the system. The "PLANNED_PRICE_ADDITIONS" functionality is specifically designed to work with planned prices, and if none exists, the system will throw this error.
    2. Incorrect Configuration: There may be a configuration issue where the system is expecting a planned price but is not set up correctly to handle it.
    3. Data Entry Error: There could be a mistake in the data entry process where the planned price was not entered or was incorrectly entered.

    Solution:

    1. Check Planned Price: Verify if the planned price is set for the material in question. You can do this by navigating to the material master record and checking the costing view.

      • Transaction Code: MM03 (Display Material)
      • Check the "Costing" view for the planned price.
    2. Set Planned Price: If the planned price is missing, you will need to set it. You can do this using the following transaction:

      • Transaction Code: CK11N (Create Cost Estimate with Quantity Structure)
      • Enter the material and plant, and ensure that you set a planned price.
    3. Review Configuration: If the planned price is set but the error persists, review the configuration settings related to product costing and planned prices. Ensure that all necessary settings are correctly configured.

    4. Consult Documentation: Refer to SAP documentation or help resources for more detailed guidance on using planned prices and the "PLANNED_PRICE_ADDITIONS" functionality.

    5. Testing: After making the necessary changes, test the process again to ensure that the error no longer occurs.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CK11N, CK40N (Change Cost Estimate), and CK24 (Display Cost Estimate).
    • Material Ledger: Understand how the Material Ledger works, especially if you are using it for actual costing.
    • Costing Variants: Review the costing variants and ensure that they are set up to handle planned prices correctly.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional insights.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in product costing.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant