Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 633
Message text: No cost apportionment schema maintained for process mat. & in plant &
No apportionment structure has been maintained for the leading
co-product (process material) &V1& in plant &V2&. The total costs of
the process cannot be apportioned to the co-products.
The cost estimate contains errors.
Maintain an apportionment structure in the costing view of material
&V1& in plant &V2&.
Error message extract from SAP system. Copyright SAP SE.
CK633
- No cost apportionment schema maintained for process mat. & in plant & ?The SAP error message CK633 indicates that there is no cost apportionment schema maintained for a specific process material in a particular plant. This error typically arises during the costing process, particularly when trying to perform a cost estimate for a material that requires a cost apportionment schema but does not have one defined.
Cause:
- Missing Cost Apportionment Schema: The primary cause of this error is that the system does not have a cost apportionment schema defined for the material in question, or it is not assigned to the relevant plant.
- Incorrect Material Master Data: The material master data may not be correctly set up, leading to the absence of the necessary configuration for cost apportionment.
- Plant-Specific Settings: The settings for the specific plant may not have been configured to include the required cost apportionment schema.
Solution:
To resolve the CK633 error, you can follow these steps:
Check Cost Apportionment Schema:
- Go to the transaction code OKTZ (Costing Variants) and check if a cost apportionment schema is defined for the relevant costing variant.
- If it is not defined, you will need to create or assign a cost apportionment schema.
Maintain Material Master Data:
- Use transaction code MM02 to edit the material master data.
- Navigate to the Costing 1 view and ensure that the cost apportionment schema is assigned correctly for the relevant plant.
Assign Cost Apportionment Schema:
- If the schema is missing, you can assign it by going to the configuration settings in the SAP system.
- Use transaction code SPRO to access the configuration menu, and navigate to:
- Controlling -> Product Cost Controlling -> Cost Object Controlling -> Maintain Cost Apportionment Schema.
- Here, you can create or modify the cost apportionment schema as needed.
Check Plant Settings:
- Ensure that the plant settings are correctly configured to use the cost apportionment schema. This may involve checking the configuration for the specific plant in the controlling area.
Test the Changes:
- After making the necessary changes, try to perform the cost estimate again to see if the error persists.
Related Information:
If you continue to experience issues after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and costing.
Get instant SAP help. Start your 7-day free trial now.
CK632
Costing lot size of co-product & calculated using process lot size
What causes this issue? Co-product &V1& is costed by means of process &V3&.System Response So that comparable results may be obtaine...
CK631
Costing lot size calculated for co-product & is lower than price unit
What causes this issue? The costing lot size in the costing view of the material master is ignored for co-products. For co-product &V1& in pl...
CK634
No cost apportionment schema maintained for process mat. & in plant &
What causes this issue? No <DS:GLOS.apportionment_structure>cost apportionment structure</> has been maintained for the material specifie...
CK635
Saving new cost estimate overwrites marked cost estimate
What causes this issue? Item &V1& of sales document &V2& has a saved, marked cost estimate, which may already have been used for <...
Click on this link to search all SAP messages.