Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 633
Message text: No cost apportionment schema maintained for process mat. & in plant &
No apportionment structure has been maintained for the leading
co-product (process material) &V1& in plant &V2&. The total costs of
the process cannot be apportioned to the co-products.
The cost estimate contains errors.
Maintain an apportionment structure in the costing view of material
&V1& in plant &V2&.
Error message extract from SAP system. Copyright SAP SE.
CK633
- No cost apportionment schema maintained for process mat. & in plant & ?The SAP error message CK633 indicates that there is no cost apportionment schema maintained for a specific process material in a particular plant. This error typically arises during the costing process, particularly when trying to perform a cost estimate for a material that requires a cost apportionment schema but does not have one defined.
Cause: Missing Cost Apportionment Schema: The primary cause of this error is that the system does not have a cost apportionment schema defined for the material in question, or it is not assigned to the relevant plant. Incorrect Material Master Data: The material master data may not be correctly set up, leading to the absence of the necessary configuration for cost apportionment. Plant-Specific Settings: The settings for the specific plant may not have been configured to include the required cost apportionment schema.
Solution: To resolve the CK633 error, you can follow these steps: Check Cost Apportionment Schema: Go to the transaction code OKTZ (Costing
Get instant SAP help. Sign up for our Free Essentials Plan.
CK632
Costing lot size of co-product & calculated using process lot size
What causes this issue? Co-product &V1& is costed by means of process &V3&.System Response So that comparable results may be obtaine...
CK631
Costing lot size calculated for co-product & is lower than price unit
What causes this issue? The costing lot size in the costing view of the material master is ignored for co-products. For co-product &V1& in pl...
CK634
No cost apportionment schema maintained for process mat. & in plant &
What causes this issue? No <DS:GLOS.apportionment_structure>cost apportionment structure</> has been maintained for the material specifie...
CK635
Saving new cost estimate overwrites marked cost estimate
What causes this issue? Item &V1& of sales document &V2& has a saved, marked cost estimate, which may already have been used for <...
Click on this link to search all SAP messages.