Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 527
Message text: Standard cost estimate for future period &2 locked by user &4
The following was established in &v3&:
You are attempting to <DS:GLOS.marking>mark</> the standard cost
estimate for material &v1& for the future posting period &v2& for
material &v1&. This cost estimate is locked by user &v4&.
The cost estimate cannot be marked.
You can mark the cost estimate when user &v4& is no longer locking it.
Error message extract from SAP system. Copyright SAP SE.
CK527
- Standard cost estimate for future period &2 locked by user &4 ?The SAP error message CK527 indicates that a standard cost estimate for a future period is locked by a specific user. This typically occurs when a user is currently working on or has locked the cost estimate for a particular period, preventing other users from making changes or creating new cost estimates for that same period.
Cause:
- User Lock: The cost estimate for the specified future period is locked by another user, which can happen if they are currently editing or have not released the lock after their session.
- Transaction in Progress: A transaction related to cost estimation is still in progress, which can lead to the locking of the cost estimate.
- System Configuration: There may be system settings or configurations that enforce locking mechanisms for cost estimates.
Solution:
- Identify the Locking User: Check which user has locked the cost estimate. This can typically be done through transaction codes like SM12 (to view locks) or SM21 (to view system logs).
- Contact the User: If possible, contact the user who has the lock to determine if they can release it or if they are finished with their work.
- Release the Lock: If the user is unavailable and the lock is no longer needed, a system administrator can release the lock using transaction SM12. However, this should be done with caution to avoid data inconsistencies.
- Wait for Release: If the lock is legitimate and the user is actively working on the cost estimate, you may need to wait until they complete their work and release the lock.
- Check for Background Jobs: Sometimes, background jobs may also hold locks. Check if there are any running jobs that might be causing the lock.
Related Information:
By following these steps, you should be able to resolve the CK527 error and continue with your cost estimation processes in SAP.
Get instant SAP help. Start your 7-day free trial now.
CK526
Cost estimate for material &1, valuation area &2 is locked
What causes this issue? The cost estimate for material &v1&, valuation area &v2&, valuation type &v3& is locked by user &...
CK525
Marked or released standard cost estimate is inconsistent
What causes this issue? Material &v1&, valuation area &v2&, valuation type &v3&: The marked (future), released (current) or p...
CK528
Company code &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK529
Posting period &1 in fiscal year &2 is invalid
What causes this issue? Posting period &V1& of fiscal year &V2& does not exist in the current company code &V3&. The system i...
Click on this link to search all SAP messages.