How To Fix CK524 - Standardd cost estimate at material master anchor inconsistent


CK524 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 524

  • Message text: Standardd cost estimate at material master anchor inconsistent

  • Show details Hide details
  • What causes this issue?

    The following was established within &v3&:
    You are attempting to mark the standard cost estimate of material &v1&
    in plant &v2& for a future posting period. The system has discovered
    inconsistent data during this process.
    The internal cost estimate number of this standard cost estimate is not
    the same as the cost estimate number of the material.
    The data inconsistency was probably caused by the number ranges being
    manipulated or by inconsistent data transfer.
    The data inconsistency affects the standard cost estimate that has
    already been marked at an earlier time point (see future material
    master anchor).

    How to fix this error?

    You can repair the data inconsistency as follows:
    Create the costing segment again.
    Carry out the standard cost estimate for the future posting period
    again, and then mark this standard cost estimate for the future posting
    period again.
    If the costing segment cannot be created again because of updated data,
    remove from the system the already-marked standard cost estimate (see
    future material master anchor) whose internal costing number is
    referencing an incorrect material (such as by
    <DS:GLOS.reorganization>reorganizing</>). Then cost and mark as
    described above.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK524 - Standardd cost estimate at material master anchor inconsistent ?
    The SAP error message CK524 indicates that there is an inconsistency in the standard cost estimate for a material in the material master. This error typically arises when the standard cost estimate does not match the expected values or when there are discrepancies in the data related to the cost estimate.
    
    Cause: Inconsistent Data: The standard cost estimate may not be updated or may have been incorrectly entered, leading to discrepancies between the material master and the cost estimate. Missing Cost Estimate: The cost estimate for the material may not have been created or released properly. Changes in Master Data: Changes in the material master data (like BOM, routing, or other related data) that have not been reflected in the cost estimate can lead to this error. Costing Variant Issues: The costing variant used may not be set up correctly or may not match the requirements for the material.
    Solution: Check Cost Estimate: Verify the standard cost

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant