Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 505
Message text: Operation &1/suboperation (or cost comp) &2: Activity type not entered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK505
- Operation &1/suboperation (or cost comp) &2: Activity type not entered ?The SAP error message CK505 indicates that there is an issue with the configuration of an activity type in the context of cost accounting. Specifically, it suggests that an activity type has not been entered for a particular operation or suboperation in a production order or cost component structure.
Cause:
- Missing Activity Type: The most common cause of this error is that the activity type has not been defined or assigned in the relevant master data (e.g., routing, work center).
- Incorrect Configuration: The configuration of the work center or routing may not include the necessary activity type for the operation or suboperation.
- Data Entry Error: There may be a data entry error where the activity type was supposed to be entered but was omitted.
Solution:
Check Routing: Go to the routing associated with the production order and ensure that the activity type is defined for the relevant operation or suboperation.
- Transaction Code: CA01 (Create Routing) or CA02 (Change Routing)
Check Work Center: Verify that the work center linked to the operation has the correct activity types assigned.
- Transaction Code: CR01 (Create Work Center) or CR02 (Change Work Center)
Assign Activity Type: If the activity type is missing, you can assign it in the work center or routing.
- Ensure that the activity type is valid and available in the system.
Costing Variant: Check the costing variant settings to ensure that the activity types are correctly configured for costing purposes.
- Transaction Code: OKKN (Costing Variants)
Recreate or Adjust Production Order: If the production order has already been created, you may need to adjust it or recreate it after making the necessary changes to the routing or work center.
Related Information:
By following these steps, you should be able to resolve the CK505 error and ensure that your activity types are correctly configured in SAP.
Get instant SAP help. Start your 7-day free trial now.
CK504
Multiple valuation method (&1) is not active
What causes this issue? &v1&: You want to mark standard cost estimates, but multiple valuation is not active for controlling area &v2&...
CK503
Std cost estimate at future material master anchor locked by user &4
What causes this issue? In &v3& the following occurred: The standard cost estimate for material &v1& in plant &v2&, which has...
CK506
Material &1 could not be valuated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK507
Error in currency translation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.