Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 424
Message text: Material & in plant & has no BOM
Material &V1& in plant &V2& has no BOM.
The material will be costed without the material components. A routing
or manual costs that may be present are included.
If necessary, create a BOM for material &V1&.
Error message extract from SAP system. Copyright SAP SE.
CK424
- Material & in plant & has no BOM ?The SAP error message CK424 indicates that a material in a specific plant does not have a Bill of Materials (BOM) associated with it. This error typically arises during processes such as costing, where the system expects to find a BOM to calculate the costs of the material.
Cause:
- Missing BOM: The primary cause of this error is that the material in question does not have a BOM defined in the system for the specified plant.
- Incorrect Plant Assignment: The BOM may exist, but it might not be assigned to the correct plant.
- Material Type Restrictions: Certain material types may not require a BOM, or the BOM may not be relevant for the material type being processed.
- Data Inconsistencies: There may be inconsistencies in the master data that prevent the system from recognizing the BOM.
Solution:
Create a BOM: If the material requires a BOM, you need to create one for the material in the specified plant. This can be done using transaction code
CS01
(Create BOM).
- Ensure that you enter the correct material number and plant.
- Define the components that make up the BOM.
Check Existing BOMs: Use transaction code
CS03
(Display BOM) to check if a BOM exists for the material in the specified plant. If it exists but is not assigned to the correct plant, you may need to create a new BOM for that plant.Review Material Master Data: Check the material master data using transaction code
MM03
(Display Material) to ensure that the material is set up correctly and that it is assigned to the correct plant.Consult with a Functional Consultant: If you are unsure about the requirements for the BOM or how to create one, consult with an SAP functional consultant who specializes in materials management or production planning.
Check Material Type Settings: Ensure that the material type allows for BOMs. Some material types may not be configured to use BOMs.
Related Information:
Transaction Codes:
CS01
: Create BOMCS02
: Change BOMCS03
: Display BOMMM03
: Display MaterialCK11N
: Create Cost Estimate with Quantity StructureBOM Types: Understand the different types of BOMs (e.g., production BOM, sales BOM) and their relevance to your material.
Documentation: Refer to SAP documentation or help files for detailed instructions on creating and managing BOMs.
User Roles: Ensure that you have the necessary authorizations to create or modify BOMs in the system.
By following these steps, you should be able to resolve the CK424 error and ensure that the material has the necessary BOM for costing and other processes.
Get instant SAP help. Start your 7-day free trial now.
CK423
Cost estimates to be archived must be in the past
What causes this issue? According to your data restrictions, you can only select cost estimates that are in the present or the future. The system iss...
CK422
Select at least one option for costing with/without qty structure
What causes this issue? You have not set either of the indicators <ls>With quantity structure </> or <ls>Without quantity structure...
CK425
Cost component &1 does not exist in cost component structure &2
What causes this issue? Cost component &V1& assigned to cost component structure &V2& does not exist. This inconsistency was probably...
CK426
Valuation type not set for material &
What causes this issue? Material &V1& in valuation area &V2& uses split valuation, in which stocks of a material are identified throu...
Click on this link to search all SAP messages.