Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 407
Message text: There is no plant &2 in company code &1. Check your entry
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK407
- There is no plant &2 in company code &1. Check your entry ?The SAP error message CK407 indicates that there is an issue with the plant and company code combination in your SAP system. Specifically, it means that the plant you are trying to use does not exist in the specified company code. Here’s a breakdown of the cause, solution, and related information for this error:
Cause:
- Incorrect Plant Code: The plant code you entered may be incorrect or misspelled.
- Plant Not Assigned: The plant may not be assigned to the specified company code in the system.
- Data Configuration Issues: There may be configuration issues in the system where the plant is not properly set up or activated for the company code.
- Master Data Issues: The master data for the plant or company code may not be correctly maintained.
Solution:
Check Plant and Company Code:
- Verify that the plant code you are entering is correct.
- Ensure that the plant exists in the system and is active.
Check Plant Assignment:
- Go to the transaction code
OX10
(orSPRO
-> Enterprise Structure -> Assignment -> Logistics General -> Assign Plant to Company Code) to check if the plant is assigned to the company code.- If the plant is not assigned, you will need to assign it to the appropriate company code.
Review Master Data:
- Check the master data for both the plant and the company code to ensure that they are correctly set up.
- You can use transaction codes like
MM03
(Display Material) to check material master data related to the plant.Consult with Configuration Team:
- If you are unsure about the configuration or if changes are needed, consult with your SAP configuration team or system administrator.
Testing:
- After making any changes, test the transaction again to see if the error persists.
Related Information:
Transaction Codes:
OX10
: Assign Plant to Company CodeSPRO
: Access to the SAP Reference IMG for configurationMM03
: Display Material MasterMM01
: Create Material MasterMM02
: Change Material MasterDocumentation: Refer to SAP Help documentation for more details on plant and company code configuration.
User Roles: Ensure that you have the necessary authorizations to view and modify plant and company code assignments.
By following these steps, you should be able to resolve the CK407 error and ensure that the plant is correctly associated with the company code in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CK406
Index table on KALKTAB incorrect
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
CK405
Cost collector counter does not exist
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
CK408
Controlling areas in source and target systems differ
What causes this issue? You are attempting to transfer a cost estimate from another plant. This cost estimate was created in a plant that is assigned...
CK409
Function not supported. Costing run has multiple costing variants
What causes this issue? You are attempting to create, change or execute a costing run with multiple costing variants.System Response The costing run...
Click on this link to search all SAP messages.