Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 350
Message text: Mat. & in plant & should be costed in cost est. w/o qty structure
The <DS:DE.CK_EKALREL>With quantity structure</> indicator in the
costing view of the master record of material &V1& in plant &V2& is not
set. The material is normally costed with a
<DS:GLOS.cost_estimate_without_quantity_structure>cost estimate without
quantity structure</>.
The system costs the material anyway, using a
<DS:GLOS.cost_estimate_with_quantity_structure>cost estimate with
quantity structure</> (that is, using any BOMs and routings that may be
present in the system).
If you normally want to cost the material using BOMs and routings, set
the <LS>With quantity structure</> indicator in the costing view of the
material's master record.
Error message extract from SAP system. Copyright SAP SE.
CK350
- Mat. & in plant & should be costed in cost est. w/o qty structure ?The SAP error message CK350 indicates that a material in a specific plant is expected to be costed in a cost estimate without a quantity structure. This typically occurs in the context of product costing, particularly when dealing with materials that do not have a defined bill of materials (BOM) or routing.
Cause:
- Missing BOM or Routing: The material may not have a BOM or routing defined, which is necessary for costing in a quantity structure.
- Costing Variant Settings: The costing variant may be set up in a way that requires a quantity structure for the material, but the material is not configured accordingly.
- Material Master Settings: The material master data may not be correctly set up for costing purposes, particularly in the costing view.
- Costing Type: The costing type being used may not be appropriate for the material in question.
Solution:
- Check BOM and Routing: Ensure that the material has a valid BOM and routing if it is supposed to be costed with a quantity structure. If not, consider whether it should be costed without a quantity structure.
- Adjust Costing Variant: Review the settings of the costing variant being used. If the material should be costed without a quantity structure, ensure that the costing variant allows for this.
- Review Material Master: Go to the material master record and check the costing view. Ensure that all necessary fields are filled out correctly and that the material is set up for costing.
- Use Alternative Costing: If the material is indeed meant to be costed without a quantity structure, you may need to use a different costing method or type that accommodates this.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific configurations related to your organization's setup.
Related Information:
If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP costing.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK349
Carry out costing in the background
What causes this issue? The cost estimate contains more than &v1& materials. This leads to a high system load.System Response Costing is ca...
CK348
Costing lot size is smaller than price unit &
What causes this issue? Price unit &V1& for material &V2& in plant &V3& is greater than the costing lot size. A possible caus...
CK351
Material master data not consistent with costing data
What causes this issue? The costing data found according to <DS:GLOS.3526B701AFAB52B9E10000009B38F974>transfer strategy</> &V3& i...
CK352
External service operation & / & has no price
What causes this issue? The operation does not have a price.System Response The operation is not included in costing.How to fix this error? Revise ...