How To Fix CK318 - Cost estimate for material & contains errors -> Planned price


CK318 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 318

  • Message text: Cost estimate for material & contains errors -> Planned price

  • Show details Hide details
  • What causes this issue?

    When an assembly was valuated, the system found that the cost component
    split of material component &V1& from plant &V2& contains errors.

    System Response

    The cost component split with errors is not changed. Instead,
    valuation is carried out with a price from the material master. This
    result goes into the cost rollup. This happens so that the costing
    result of the finished product is still meaningful.
    <ZH>Note</> The subsequent valuation is always with valuation variant
    &V3&. Valuations with a manual cost component split are not taken
    into account. This affects the following two cases:
    strategy '8': valuation with manual cost component split
    the possibility to calcualte manual cost component splits in addition
    to the valuation strategy entered.

    How to fix this error?

    Analyze the cost component split with errors and solve them.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK318 - Cost estimate for material & contains errors -> Planned price ?
    The SAP error message CK318 indicates that there are issues with the cost estimate for a material, specifically related to the planned price. This error typically arises during the cost estimation process in the Controlling (CO) module, particularly when using the CK11N or CK40N transactions for creating or changing cost estimates.
    Causes of CK318 Error
    
    
    Missing or Incorrect Master Data: The material master data may be incomplete or incorrect. This includes missing information in the accounting view or the costing view.
    
    
    Price Control Indicator: The price control indicator (standard price or moving average price) may not be set correctly for the material.
    
    
    Costing Variants: The costing variant used may not be configured properly, leading to issues in calculating the planned price.
    
    
    Cost Components: There may be issues with the cost components or cost element assignments in the cost estimate.
    
    
    Currency Issues: If there are discrepancies in currency settings or if the currency conversion is not set

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author