Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 299
Message text: No alternative to multi-level BOM found for material & in plant &
In the BOM application &v3& the definition is such that the system is
to access the tables stored in customizing for routings for finding
alternatives with multiple BOMs.
However, material &V1& in plant &V2& is not assigned to an alternative
BOM.
Costing could not be carried out.
If you have authorization for Customizing, complete the missing entry
in the table for the selection of bills of material with the
alternative you require.
INCLUDE 'NA_CKSYSAD_AN'
Error message extract from SAP system. Copyright SAP SE.
CK299
- No alternative to multi-level BOM found for material & in plant & ?The SAP error message CK299 indicates that the system could not find an alternative multi-level Bill of Materials (BOM) for a specified material in a given plant. This error typically arises during processes such as costing, where the system attempts to retrieve BOM data for a material but fails to find a suitable alternative.
Causes:
- Missing BOM: The primary cause is that there is no BOM defined for the material in the specified plant.
- Incorrect Plant or Material: The material or plant specified in the transaction may be incorrect or not properly maintained in the system.
- BOM Status: The BOM may be inactive or not valid for the specified period.
- Alternative BOMs: If the system is configured to look for alternative BOMs and none are available, this error can occur.
- Configuration Issues: There may be issues with the configuration of the BOM or the material master data.
Solutions:
- Check BOM Existence: Verify that a BOM exists for the material in the specified plant. You can do this using transaction code
CS03
(Display BOM).- Create or Update BOM: If no BOM exists, you may need to create one using transaction code
CS01
(Create BOM). If a BOM exists but is not valid, consider updating it.- Verify Material and Plant: Ensure that the material number and plant are correctly specified in the transaction. Check for typos or incorrect entries.
- Check BOM Status: Ensure that the BOM is active and valid for the required period. You can check the validity dates in the BOM details.
- Review Alternative BOMs: If your process requires alternative BOMs, ensure that they are defined and active for the material in question.
- Consult with Configuration Team: If the issue persists, consult with your SAP configuration team to ensure that the system is set up correctly to handle BOMs and alternatives.
Related Information:
CS01
: Create BOMCS02
: Change BOMCS03
: Display BOMCS11
: Create single-level BOMCS12
: Display multi-level BOMMM03
to ensure that all relevant data is correctly maintained.By following these steps, you should be able to identify the cause of the CK299 error and implement the appropriate solution.
Get instant SAP help. Start your 7-day free trial now.
CK298
Internal error: incorrect call during routing selection
What causes this issue? Internal error.How to fix this error? INCLUDE 'NA_CKSYSAD' OBJECT TEXT ID STError message extract from SAP system....
CK297
No selection ID & for task list selection
What causes this issue? The selection ID &V1& used for costing with quantity structure for determining the alternative routings automatically...
CK300
Control key & is not defined in Customizing
What causes this issue? When attempting to cost an operation with control key &V1&, the system determined that this control key is not define...
CK301
Costing variant & not costed in costing run
What causes this issue? At least one material that has been released with valuation variant &V2& was found under costing variant &V1&...
Click on this link to search all SAP messages.