Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 272
Message text: Lot size & & was transferred from the MRP segment
If there is no lot size in the costing segment of the material master,
the lot size used for the cost estimate is the fixed purchase order
quantity from the material requirements planning segment.
Alternatively, you can enter the lot size manually.
<DS:TRAN.MM02>Check material master</>
Error message extract from SAP system. Copyright SAP SE.
CK272
- Lot size & & was transferred from the MRP segment ?The SAP error message CK272 typically indicates an issue related to the lot size in the Material Requirements Planning (MRP) segment of a material master record. This error can occur during various processes, such as when trying to create or change a production order, or during the MRP run.
Cause:
The error message CK272 is triggered when the lot size defined in the material master or the MRP segment does not match the expected or required lot size for the operation being performed. This can happen due to several reasons, including:
- Inconsistent Lot Size Settings: The lot size defined in the material master (MRP view) may not align with the lot size used in the production order or the planned order.
- Missing or Incorrect MRP Data: The MRP data for the material may be incomplete or incorrectly configured, leading to discrepancies.
- Changes in Master Data: Recent changes to the material master data that have not been properly reflected in related documents or orders.
- Lot Size Calculation Issues: The system may be unable to calculate the appropriate lot size based on the current settings and requirements.
Solution:
To resolve the CK272 error, you can take the following steps:
Check Material Master Data:
- Go to the material master record (transaction code MM03) and review the MRP view.
- Ensure that the lot size settings (e.g., lot size type, minimum and maximum lot sizes) are correctly defined.
Review Production Order/Planned Order:
- Check the production order or planned order to ensure that the lot size specified there matches the lot size defined in the material master.
- If necessary, adjust the lot size in the order to match the material master settings.
MRP Configuration:
- Verify the MRP configuration settings in the system to ensure they are set up correctly for the material in question.
- Check if the MRP type and lot size calculation method are appropriate for the material.
Re-run MRP:
- If changes were made to the material master or orders, consider re-running the MRP process to ensure that all data is updated and consistent.
Consult Documentation:
- Review SAP documentation or help resources for additional insights on lot size settings and MRP configuration.
Seek Help from SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the CK272 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CK271
Costing run & & was canceled
What causes this issue? Costing run &V1& &V2& was cancelled on account of a costing that was already locked. The lock was caused beca...
CK270
Error with DELETE
What causes this issue? System errorHow to fix this error? INCLUDE 'NA_CKSYSAD' OBJECT TEXT ID STError message extract from SAP system. Co...
CK273
Error when selecting costing levels (please check your entry)
What causes this issue? You have selected a costing level for marking, but the levels below it do not have the 'Marked' status.How to fix t...
CK274
Error when selecting costing levels (please check your entry)
What causes this issue? You have selected a costing level for release, but the levels below it do not have the status <ZH>Released</>.How...
Click on this link to search all SAP messages.