Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 817
Message text: Change mode has been switched on
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ817
- Change mode has been switched on ?The SAP error message CJ817, which states "Change mode has been switched on," typically occurs in the context of project management within SAP, particularly when dealing with project structures, WBS (Work Breakdown Structure) elements, or network activities. This message indicates that the system is in a mode where changes can be made to the project structure or related data.
Cause:
- Change Mode Activation: The error usually arises when a user attempts to perform an action that is not allowed while the system is in change mode. This can happen if the user is trying to edit or modify a project element that is currently locked or if the project is in a status that does not allow changes.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the project or WBS elements.
- Project Status: The project or WBS element may be in a status that restricts changes (e.g., completed or closed).
Solution:
- Check Project Status: Verify the status of the project or WBS element. If it is in a status that does not allow changes, you may need to change the status or unlock the project.
- Exit Change Mode: If you are in change mode and do not intend to make changes, you can exit change mode by navigating to the appropriate menu option or using the relevant transaction code to switch back to display mode.
- Authorization Check: Ensure that you have the necessary authorizations to make changes. If not, contact your SAP security administrator to request the required permissions.
- Consult Documentation: Review the project management documentation or SAP notes related to the specific transaction you are using to understand any additional restrictions or requirements.
- System Lock: If the project is locked by another user or process, you may need to wait until the lock is released or contact the user who has the lock.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP's official documentation for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ816
The method table is not consistent with the data tables
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ815
The transfered hierarchy is inconsistent
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ818
Change mode has been switched off
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ819
This function is not permissible for all project elements
What causes this issue? You want to execute a function that is not permissible for all project objects.How to fix this error? Use the selected only ...
Click on this link to search all SAP messages.