How To Fix CJ754 - WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed.


CJ754 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 754

  • Message text: WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed.

  • Show details Hide details
  • What causes this issue?

    WBS element &V1& is not defined as an
    <GL:account_assignment_element>account assignment element</>. You
    cannot assign an asset under construction.
    <ZH>Note:</>
    If you release a WBS element, the system checks whether you have
    assigned an investment profile. If this is the case, the system
    identifies the WBS element as a capital investment measure and
    automatically creates a corresponding asset under construction.

    System Response

    INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX

    How to fix this error?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Define WBS element &V1& as an account assignment element
    <ZH>or</>
    remove the investment profile (profile detail screen).

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ754 - WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed. ?
    The SAP error message CJ754 indicates that there is an issue with the assignment of a Work Breakdown Structure (WBS) element to an asset under construction (AuC). Specifically, the error states that the WBS element you are trying to use is not allowed as an account assignment element for assets under construction.
    
    Cause: Incorrect Configuration: The WBS element may not be configured correctly in the system to allow for asset under construction assignments. Account Assignment Type: The WBS element may not be set up to allow for the specific account assignment type that is required for assets under construction. Project Structure: The project structure may not be properly defined, leading to restrictions on how costs can be assigned to WBS elements. Authorization Issues: There may be authorization issues preventing the assignment of the WBS element to the asset under construction.
    Solution: Check WBS Element Configuration: Go to the WBS element in the project system and check its configuration.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker