Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 754
Message text: WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed.
WBS element &V1& is not defined as an
<GL:account_assignment_element>account assignment element</>. You
cannot assign an asset under construction.
<ZH>Note:</>
If you release a WBS element, the system checks whether you have
assigned an investment profile. If this is the case, the system
identifies the WBS element as a capital investment measure and
automatically creates a corresponding asset under construction.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Define WBS element &V1& as an account assignment elementError message extract from SAP system. Copyright SAP SE.
CJ754
- WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed. ?The SAP error message CJ754 indicates that there is an issue with the assignment of a Work Breakdown Structure (WBS) element to an asset under construction (AuC). Specifically, the error states that the WBS element you are trying to use is not allowed as an account assignment element for assets under construction.
Cause:
- Incorrect Configuration: The WBS element may not be configured correctly in the system to allow for asset under construction assignments.
- Account Assignment Type: The WBS element may not be set up to allow for the specific account assignment type that is required for assets under construction.
- Project Structure: The project structure may not be properly defined, leading to restrictions on how costs can be assigned to WBS elements.
- Authorization Issues: There may be authorization issues preventing the assignment of the WBS element to the asset under construction.
Solution:
Check WBS Element Configuration:
- Go to the WBS element in the project system and check its configuration. Ensure that it is set up to allow for asset under construction assignments.
- You can do this by navigating to the WBS element in transaction code CJ02 (Change WBS Element) and reviewing the settings.
Review Account Assignment Settings:
- Ensure that the account assignment category for the WBS element is compatible with asset under construction. This can be checked in the project definition or WBS element settings.
Adjust Project Structure:
- If the project structure is not correctly defined, you may need to adjust it. Ensure that the hierarchy and relationships between WBS elements and assets are correctly established.
Check Authorizations:
- Verify that you have the necessary authorizations to assign the WBS element to the asset under construction. If not, contact your SAP security administrator.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific configuration settings related to WBS elements and asset under construction.
Testing:
- After making the necessary changes, test the assignment again to ensure that the error is resolved.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuration.
Training and Documentation: Consider reviewing SAP training materials or documentation related to project systems and asset accounting for a deeper understanding of WBS elements and their configurations.
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CJ753
Requested company code &1 was copied from requested cost center &2
What causes this issue? The requesting company code &V1& was derived from the requesting cost center &V2& (controlling area &V3&a...
CJ752
Enter controlling area and cost center
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ755
Assignment to capital investment program can not be changed
What causes this issue? When you change the assignments to an investment program, the system checks all the existing assignments in the complete WBS ...
CJ756
Character is already used as first character in an edit screen
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.