How To Fix CJ729 - Requesting cost center initialized for WBS &1


CJ729 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 729

  • Message text: Requesting cost center initialized for WBS &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ729 - Requesting cost center initialized for WBS &1 ?
    The SAP error message CJ729 ("Requesting cost center initialized for WBS &1") typically occurs in the context of project management and controlling within SAP, particularly when dealing with Work Breakdown Structures (WBS) and cost centers. This error indicates that a cost center has not been assigned or initialized for the specified WBS element.
    
    Cause: Missing Cost Center Assignment: The WBS element you are trying to work with does not have a cost center assigned to it. This can happen if the WBS element was created without specifying a cost center or if the cost center was deleted or changed after the WBS was created. Incorrect Configuration: There may be configuration issues in the project system settings that prevent the proper assignment of cost centers to WBS elements. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or assign cost centers to WBS elements.
    Solution: Assign a Cost Center: Go to the WBS element

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker