Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 715
Message text: Enter level
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ715
- Enter level ?The SAP error message CJ715 "Enter level" typically occurs in the context of project management within SAP, particularly when dealing with project structures and WBS (Work Breakdown Structure) elements. This error indicates that the system expects a level to be specified for a particular operation, but it has not been provided.
Cause:
- Missing Level Specification: The most common cause of this error is that the user has not specified a level when trying to create or modify a project structure or WBS element.
- Incorrect Navigation: The user may be trying to navigate to a level that does not exist or is not properly defined in the project hierarchy.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to access certain levels of the project structure.
Solution:
- Specify the Level: When prompted with the error, ensure that you enter the required level in the appropriate field. This may involve selecting a WBS element or project definition that corresponds to the level you are trying to access or create.
- Check Project Structure: Review the project structure to ensure that the levels are correctly defined and that you are navigating to the correct level.
- Authorization Check: Verify that you have the necessary authorizations to access and modify the project structure. If not, contact your SAP administrator to obtain the required permissions.
- Use the Correct Transaction: Ensure that you are using the correct transaction code for the operation you are trying to perform. For example, if you are trying to create or change a WBS element, use the appropriate transaction code (e.g., CJ20N for Project Builder).
- Consult Documentation: If the issue persists, refer to SAP documentation or help resources for further guidance on project management and WBS elements.
Related Information:
If the problem continues after trying these solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ714
Statistical WBS element: No surcharges, settlement etc. &
What causes this issue? A statistical WBS element cannot be settled, nor carry overheads, nor can results analysis be carried out for it. Therefore i...
CJ713
Costs for WBS could not be displayed
What causes this issue? The costs for the WBS could not be displayed. There are several different reasons for this: The WBS does not have any costs. ...
CJ716
Asset under construction for & not allowed
What causes this issue? You want to assign WBS element &V1& to an asset under construction. The requesting (responsible) cost center in the ...
CJ717
Subproject & is not valid (check your entry)
What causes this issue? Subproject &V1& does not exist.System Response Processing stopped.How to fix this error? RESET N1 Check your entry....