Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 711
Message text: You cannot create another WBS element for project definition &
You can use the automatic value transfer for the project definition &V1&
because of this, you cannot create any more WBS elements for it.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
You can deactivate the automatic value transfer for the project
definition &V1& by selecting the function <ZH>Change project definition
</> and then saving.
Error message extract from SAP system. Copyright SAP SE.
CJ711
- You cannot create another WBS element for project definition & ?The SAP error message CJ711 indicates that you cannot create another Work Breakdown Structure (WBS) element for a specific project definition. This typically occurs when the project definition has reached its limit for the number of WBS elements that can be created under it.
Cause:
- Limit Reached: Each project definition in SAP has a predefined limit on the number of WBS elements that can be created. If this limit is reached, you will encounter this error.
- Project Structure: The project structure may be designed in such a way that it does not allow for additional WBS elements.
- Configuration Settings: The system configuration may impose restrictions on the number of WBS elements allowed for a project.
Solution:
- Check Existing WBS Elements: Review the existing WBS elements under the project definition to confirm if the limit has been reached.
- Delete Unused WBS Elements: If there are any WBS elements that are no longer needed, consider deleting them to free up space for new ones.
- Review Project Structure: If the project structure allows for it, consider restructuring the project to accommodate additional WBS elements.
- Consult Configuration Settings: If you have access to the configuration settings, check if the limit for WBS elements can be increased. This may require assistance from a system administrator or SAP consultant.
- Create a New Project Definition: If the project definition is full and cannot be modified, consider creating a new project definition and structuring it to accommodate the additional WBS elements.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a professional with expertise in SAP project management.
Get instant SAP help. Start your 7-day free trial now.
CJ710
Automatic transfer to project definition is deactivated
What causes this issue? The <zh>Trsfr to proj. def.</>indicator is set in project profile &v2& for project &v1&. This ind...
CJ709
You have not entered a project definition or a project profile
What causes this issue? You have not entered a project definition or a project profile when you created the WBS element.System Response INCLUDE ...
CJ712
Project currency must be same as company code currency
What causes this issue? No more than two currencies may be used within a project. Because the controlling area already allows for another currency f...
CJ713
Costs for WBS could not be displayed
What causes this issue? The costs for the WBS could not be displayed. There are several different reasons for this: The WBS does not have any costs. ...