How To Fix CJ694 - Assign a valid plan profile to project &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 694

  • Message text: Assign a valid plan profile to project &1

  • Show details Hide details
  • What causes this issue?

    A revenue element is required before the system can derive the planned
    revenues from the billing plan. You define this in plan profile.
    No plan profile is assigned to project &V1& or the one assigned is not
    valid.

    System Response

    Billing plan processing is not possible.

    How to fix this error?

    Assign a valid revenue element to plan profile &V1&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ694 - Assign a valid plan profile to project &1 ?

    The SAP error message CJ694 "Assign a valid plan profile to project &1" typically occurs in the context of project management within SAP, particularly when dealing with project planning and budgeting. This error indicates that the project you are trying to work with does not have a valid planning profile assigned to it.

    Cause:

    1. Missing Planning Profile: The project does not have a planning profile assigned, which is necessary for defining how planning is to be carried out for that project.
    2. Invalid Planning Profile: The planning profile assigned to the project is either not valid or does not exist in the system.
    3. Configuration Issues: There may be issues with the configuration of the project management module in SAP, leading to the inability to assign a valid planning profile.

    Solution:

    1. Assign a Valid Planning Profile:

      • Go to the project definition in SAP (transaction code CJ02 for changing project definitions).
      • Navigate to the "Planning" tab.
      • Check if a planning profile is assigned. If not, select a valid planning profile from the dropdown list and assign it to the project.
      • Save the changes.
    2. Check Planning Profile Configuration:

      • If you are unsure which planning profiles are available or valid, you can check the configuration in the project management settings (transaction code OPU3).
      • Ensure that the planning profiles are correctly defined and activated.
    3. Consult Documentation: If you are not familiar with the planning profiles, refer to the SAP documentation or consult with your SAP administrator or functional consultant for guidance on which planning profiles are appropriate for your projects.

    4. Authorization Issues: Ensure that you have the necessary authorizations to assign planning profiles to projects. If you lack the required permissions, contact your SAP security administrator.

    Related Information:

    • Transaction Codes:
      • CJ02: Change Project
      • OPU3: Define Planning Profiles
    • SAP Notes: Check for any relevant SAP Notes that might address specific issues related to planning profiles and project management.
    • Training and Documentation: Consider reviewing SAP training materials or documentation related to project management and planning profiles for a better understanding of how to manage projects effectively in SAP.

    By following these steps, you should be able to resolve the CJ694 error and successfully assign a valid planning profile to your project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker