Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 679
Message text: You are not allowed to assign a network to WBS element &
You want to assign WBS element &V1& one or more networks.
The current status of WBS element &v1& does not allow the asssignment
of networks
To assign networks, you must change the status of WBS element &v1&
correspondingly.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CJ679
- You are not allowed to assign a network to WBS element & ?The SAP error message CJ679 indicates that you are trying to assign a network to a Work Breakdown Structure (WBS) element, but the system is preventing this action due to certain restrictions or settings. Here’s a breakdown of the potential causes, solutions, and related information for this error:
Causes:
- Authorization Issues: The user may not have the necessary authorizations to assign networks to the specified WBS element.
- WBS Element Settings: The WBS element may be configured in such a way that it does not allow the assignment of networks. This could be due to its status or settings in the project structure.
- Network Type Restrictions: Certain types of networks may not be allowed to be assigned to specific WBS elements based on the project type or configuration.
- Project Status: The project or WBS element may be in a status that does not permit changes, such as being locked or completed.
Solutions:
- Check Authorizations: Ensure that the user has the necessary permissions to assign networks to WBS elements. This can be done by reviewing the user roles and authorizations in the SAP system.
- Review WBS Element Configuration: Check the settings of the WBS element to see if it is configured to allow network assignments. You may need to adjust the settings or create a new WBS element that allows network assignments.
- Verify Network Type: Ensure that the network type you are trying to assign is compatible with the WBS element. You may need to consult with your project management or SAP configuration team to understand the restrictions.
- Check Project Status: Verify the status of the project and the WBS element. If it is locked or completed, you may need to unlock it or change its status to allow for modifications.
- Consult Documentation: Refer to SAP documentation or help resources for specific details regarding the error message and its implications.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems.
Get instant SAP help. Start your 7-day free trial now.
CJ678
Assignment of order to WBS element & is not allowed
What causes this issue? You want to assign an order to WBS element &v1&.System Response The current status of the WBS element does not allow...
CJ677
Assignment of internal order to WBS element & is not allowed
What causes this issue? You want to assign an internal order to WBS element &v1&.System Response The current status of the WBS element does ...
CJ680
Grayed-out special indicators are already being used
What causes this issue? If you use a special character that is already being used in an edit screen, you cannot change or delete the special characte...
CJ681
At least one coding mask is already being used
What causes this issue? In this client you can save project numbers and WBS numbers that you have edited to the database, in order to more effectivel...
Click on this link to search all SAP messages.