Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 665
Message text: Definition: & &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ665
- Definition: & & ?The SAP error message CJ665 typically relates to issues with project definitions in the Project System (PS) module. The message indicates that there is a problem with the project definition, which could be due to various reasons such as missing or incorrect data.
Cause:
- Missing Project Definition: The project you are trying to access or modify does not exist or has not been properly defined.
- Incorrect Status: The project might be in a status that does not allow for the action you are trying to perform (e.g., locked, completed).
- Authorization Issues: The user may not have the necessary authorizations to access or modify the project definition.
- Data Inconsistencies: There may be inconsistencies in the data related to the project definition, such as missing required fields.
Solution:
- Check Project Definition: Verify that the project definition exists and is correctly set up. You can do this by navigating to the project in the Project System and checking its details.
- Review Project Status: Ensure that the project is in a status that allows for the desired action. If the project is locked or completed, you may need to change its status.
- Authorization Check: Ensure that you have the necessary authorizations to access and modify the project. You may need to contact your SAP security administrator for assistance.
- Data Validation: Check for any missing or incorrect data in the project definition. Ensure that all required fields are filled out correctly.
- Transaction Codes: Use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to review and modify the project definition.
Related Information:
If the problem persists after trying the above solutions, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ664
Physical inventory for material not completed or locked for movements
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ663
You cannot add an actual date horizontal bar
What causes this issue? You want to add an actual date horizontal bar to a network activity in the diagram area of the project planning board.System ...
CJ666
Element: & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ671
Master data in project definition & is locked
What causes this issue? The project definition &V1& is locked. You cannot change any data.System Response INCLUDE 'NA_ALLG_NOVERARBEITU...
Click on this link to search all SAP messages.