Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 663
Message text: You cannot add an actual date horizontal bar
You want to add an actual date horizontal bar to a network activity in
the diagram area of the project planning board.
You cannot set actual dates in this way.
If you want to set an actual date for a network activity, create a
confirmation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CJ663
- You cannot add an actual date horizontal bar ?The SAP error message CJ663 ("You cannot add an actual date horizontal bar") typically occurs in the context of project management within SAP, particularly when dealing with project planning and scheduling in the Project System (PS) module. This error indicates that there is an issue with the actual dates being entered for a project or activity.
Cause:
- Incorrect Date Entry: The actual dates being entered may not align with the planned dates or may fall outside the permissible range.
- Status of the Project: The project or activity may be in a status that does not allow for changes to actual dates (e.g., if the project is closed or completed).
- Missing Authorizations: The user may not have the necessary authorizations to make changes to actual dates.
- Project Structure Issues: There may be inconsistencies or issues in the project structure that prevent the addition of actual dates.
Solution:
- Check Date Validity: Ensure that the actual dates you are trying to enter are valid and fall within the planned dates. Adjust the dates accordingly.
- Review Project Status: Verify the status of the project or activity. If it is closed or completed, you may need to reopen it or consult with a project manager to make the necessary changes.
- Authorization Check: Ensure that you have the required authorizations to modify actual dates. If not, contact your SAP administrator to obtain the necessary permissions.
- Project Structure Review: Check the project structure for any inconsistencies. Ensure that all components of the project are correctly set up and that there are no missing links or dependencies.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines related to the Project System and handling actual dates.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ662
The status of the WBS element does allow changes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ661
Stock still exists for WBS element &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ664
Physical inventory for material not completed or locked for movements
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ665
Definition: & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.