How To Fix CJ649 - Top-down planning: The function "project dates" is not possible


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 649

  • Message text: Top-down planning: The function "project dates" is not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ649 - Top-down planning: The function "project dates" is not possible ?

    The SAP error message CJ649, which states "Top-down planning: The function 'project dates' is not possible," typically occurs in the context of project management within SAP, particularly when using the Project System (PS) module. This error indicates that there is an issue with the project dates that prevents the system from performing top-down planning.

    Causes:

    1. Project Status: The project may be in a status that does not allow for changes to the project dates. For example, if the project is already completed or locked, you may not be able to adjust the dates.
    2. Planning Type: The planning type set for the project may not support top-down planning. If the project is set up for bottom-up planning, you will encounter this error when trying to use top-down planning functions.
    3. Missing Authorizations: The user may not have the necessary authorizations to change project dates or perform top-down planning.
    4. Inconsistent Data: There may be inconsistencies in the project data, such as missing or incorrect entries in the project definition or WBS elements.
    5. Project Structure: The project structure may not be correctly defined, leading to issues with date calculations.

    Solutions:

    1. Check Project Status: Verify the status of the project. If it is completed or locked, you may need to change the status to allow for date adjustments.
    2. Review Planning Type: Ensure that the planning type for the project is set to allow top-down planning. You may need to adjust the planning settings in the project definition.
    3. Authorization Check: Confirm that the user has the necessary authorizations to modify project dates. If not, contact your SAP security administrator to obtain the required permissions.
    4. Data Consistency Check: Review the project data for any inconsistencies. Ensure that all required fields are filled out correctly and that there are no missing entries.
    5. Project Structure Review: Check the project structure to ensure that it is correctly defined. Make sure that all WBS elements are properly linked and that there are no errors in the hierarchy.

    Related Information:

    • Transaction Codes: You can use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to review and modify project details.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message. SAP Notes can provide patches or additional guidance.
    • Documentation: Refer to SAP documentation on project planning and management for more detailed information on top-down planning and project date management.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.