How To Fix CJ648 - Milestone for WBS element cannot be copied to an operation


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 648

  • Message text: Milestone for WBS element cannot be copied to an operation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ648 - Milestone for WBS element cannot be copied to an operation ?

    The SAP error message CJ648 ("Milestone for WBS element cannot be copied to an operation") typically occurs when there is an attempt to copy a milestone from a Work Breakdown Structure (WBS) element to an operation in a project. This error indicates that the system does not allow the copying of milestones directly to operations due to certain constraints or configurations.

    Causes:

    1. Incompatibility of Milestones and Operations: Milestones are specific points in time that signify important events in a project, while operations are tasks or activities that need to be performed. The system may not allow the direct copying of milestones to operations because they serve different purposes.

    2. Project Structure Issues: The project structure may not be set up correctly, or the WBS element may not be properly linked to the operations.

    3. Configuration Settings: There may be specific configuration settings in the project management module that restrict the copying of milestones to operations.

    4. Missing Authorizations: The user may not have the necessary authorizations to perform the action of copying milestones.

    Solutions:

    1. Manual Entry: Instead of copying the milestone, manually create the operation and set the relevant dates or attributes that correspond to the milestone.

    2. Check Project Structure: Ensure that the WBS element is correctly structured and that it is properly linked to the operations. Review the hierarchy and relationships in the project.

    3. Review Configuration: Consult with your SAP project management configuration team to review the settings related to milestones and operations. Adjustments may be needed to allow for the desired functionality.

    4. Authorization Check: Verify that the user has the necessary permissions to perform the action. If not, request the appropriate authorizations from your SAP security team.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling milestones and operations within your version of SAP.

    6. SAP Notes: Check for any relevant SAP Notes that may address this issue. Sometimes, there are known issues or patches that can resolve specific error messages.

    Related Information:

    • SAP Project System (PS): Understanding the differences between WBS elements, milestones, and operations within the SAP Project System module can help clarify why this error occurs.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change WBS Element) to manage project structures effectively.
    • User Training: Ensure that users are trained on the proper procedures for managing milestones and operations to avoid similar errors in the future.

    If the issue persists after trying the above solutions, it may be beneficial to engage with SAP support or your internal SAP team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant