Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 622
Message text: Costs calculated for WBS element &
Costs for WBS element &V1& were calculated by the system.
You can display the costs via the menu.
Error message extract from SAP system. Copyright SAP SE.
CJ622
- Costs calculated for WBS element & ?The SAP error message CJ622 indicates that costs have been calculated for a Work Breakdown Structure (WBS) element, but there may be an issue with the data or configuration that is preventing further processing. This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project-related costs.
Cause:
- Cost Calculation Issues: The error may occur if there are inconsistencies or issues with the cost calculation for the specified WBS element. This could be due to missing or incorrect data in the project structure or cost planning.
- Status of WBS Element: The WBS element may be in a status that does not allow for further cost postings or calculations. For example, if the WBS element is locked or has been set to a status that prevents further changes.
- Missing Master Data: Required master data (like cost centers, internal orders, or activity types) may be missing or incorrectly configured.
- Budget Availability: If the WBS element has a budget and the costs exceed the available budget, this could trigger the error.
- Authorization Issues: The user may not have the necessary authorizations to perform actions related to the WBS element.
Solution:
- Check WBS Element Status: Verify the status of the WBS element in the project structure. Ensure it is not locked or in a status that prevents cost calculations.
- Review Cost Planning: Check the cost planning for the WBS element to ensure that all necessary data is correctly entered and that there are no discrepancies.
- Validate Master Data: Ensure that all required master data is available and correctly configured. This includes checking cost centers, internal orders, and any other relevant data.
- Budget Check: Review the budget assigned to the WBS element. If costs exceed the budget, consider adjusting the budget or reviewing the cost entries.
- Authorization Check: Ensure that the user has the necessary authorizations to perform the required actions on the WBS element.
- Recalculate Costs: If necessary, try to recalculate the costs for the WBS element using the appropriate transaction codes (e.g., CJ40 for planning, CJ88 for settlement).
Related Information:
By following these steps, you should be able to identify the cause of the CJ622 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CJ621
Structure indicator & ... is locked
What causes this issue? Key &V1& is not allowed for creating new objects. In this situation, you cannot create any new standard project defin...
CJ620
Project number or WBS number may not be used
What causes this issue? The key you entered for a project definition or WBS element is not valid according to the settings in Customizing.System Resp...
CJ623
Costs not completely calculated for WBS element & -> see log
What causes this issue? Costs could not be calculated completely for WBS element &V1&.How to fix this error? You can get an overview of erro...
CJ624
Log contains no entries
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...