Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 591
Message text: Enter start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ591
- Enter start date ?The SAP error message CJ591 "Enter start date" typically occurs in the context of project management within the SAP system, particularly when dealing with project definitions, work breakdown structures (WBS), or network activities. This error indicates that a required field for the start date has not been filled in, which is necessary for the system to process the project or activity correctly.
Cause:
- Missing Start Date: The most common cause of this error is that the user has not entered a start date for a project, WBS element, or network activity.
- Incorrect Data Entry: The start date may have been entered incorrectly or in an invalid format.
- System Configuration: There may be configuration settings in the project management module that require a start date to be filled in before proceeding.
Solution:
- Enter Start Date: Navigate to the relevant project, WBS element, or network activity and enter a valid start date in the designated field.
- Check Date Format: Ensure that the date is entered in the correct format as per your system's configuration (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Review Project Settings: If you are consistently encountering this error, review the project settings or consult with your SAP administrator to ensure that the configuration is set up correctly.
- User Authorization: Ensure that you have the necessary permissions to make changes to the project or activity details.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ590
Scale & for time axis does not exist
What causes this issue? There is no scale for the time axis &V1&.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TXHow t...
CJ589
No dates for WBS or project definition exist
What causes this issue? There must be a time frame in order for you to enter activities for a WBS element. It can come from the: WBS element superior...
CJ592
Enter finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ593
No parameters for WBS scheduling. Maintain settings
What causes this issue? You have not entered a profile for WBS scheduling in the project profileSystem Response INCLUDE 'NA_ALLG_NOFUNKTION...