How To Fix CJ519 - Enter a WBS element


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 519

  • Message text: Enter a WBS element

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ519 - Enter a WBS element ?

    The SAP error message CJ519, which states "Enter a WBS element," typically occurs when a user attempts to perform an action related to project management (such as creating a project, assigning costs, or entering a transaction) without specifying a Work Breakdown Structure (WBS) element. The WBS element is crucial in project management as it helps in organizing and defining the total scope of a project.

    Cause:

    1. Missing WBS Element: The most common cause of this error is that the user has not entered a WBS element in the relevant field.
    2. Incorrect Transaction: The transaction being executed may require a WBS element, and if it is not applicable or not entered, the system will throw this error.
    3. Authorization Issues: In some cases, the user may not have the necessary authorizations to view or enter WBS elements.
    4. Configuration Issues: There may be configuration settings in the project system that require a WBS element for certain transactions.

    Solution:

    1. Enter a WBS Element: The simplest solution is to ensure that you enter a valid WBS element in the required field. You can do this by:

      • Navigating to the relevant transaction (e.g., CJ20N for project management).
      • Finding the WBS element field and entering a valid WBS element code.
    2. Check for Valid WBS Elements: If you are unsure of the WBS element to enter, you can:

      • Use the WBS element search functionality (e.g., using transaction CJ03 to display WBS elements).
      • Consult with your project manager or team to identify the correct WBS element.
    3. Review Authorizations: If you suspect that authorization issues may be causing the problem, check with your SAP security team to ensure you have the necessary permissions to access and enter WBS elements.

    4. Consult Configuration Settings: If the issue persists, it may be necessary to consult with your SAP configuration team to review the project system settings and ensure that they are correctly set up to allow for the entry of WBS elements.

    Related Information:

    • WBS Element Structure: Understanding the structure of WBS elements in your organization can help in correctly identifying and entering them.
    • Project Management Transactions: Familiarize yourself with relevant SAP transactions related to project management, such as CJ01 (Create WBS), CJ02 (Change WBS), and CJ20N (Project Builder).
    • SAP Documentation: Refer to SAP Help documentation for detailed information on project management and WBS elements.
    • Training: Consider undergoing training on SAP Project System (PS) if you frequently work with project management functionalities.

    By following these steps, you should be able to resolve the CJ519 error and successfully enter the required WBS element in your SAP transactions.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author