Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 437
Message text: Do not enter a level greater than &
To ensure the correct placement of the new WBS element &V3& in the work
breakdown structure, you cannot position the WBS element more than one
level below the superior WBS element.
Since the superior WBS element is at level &V2&, the highest level you
can enter for WBS element &V3& is &V1&. However, you have entered level
&V4&.
The system does not move WBS element &V3& to level &V4&.
Change the level.
Error message extract from SAP system. Copyright SAP SE.
CJ437
- Do not enter a level greater than & ?The SAP error message CJ437 ("Do not enter a level greater than &") typically occurs in the context of project management within the SAP system, particularly when dealing with Work Breakdown Structures (WBS) or project hierarchies. This error indicates that the user is attempting to create or modify a project structure that exceeds the maximum allowed level of hierarchy defined in the system.
Cause:
- Hierarchy Level Exceeded: The most common cause of this error is that the user is trying to create a WBS element or project structure that goes beyond the predefined maximum level of hierarchy set in the system configuration.
- Configuration Settings: The maximum level of hierarchy is defined in the project system settings, and it can vary based on the organization's requirements or system settings.
Solution:
- Check Configuration: Review the project system configuration to determine the maximum allowed level of hierarchy. This can typically be found in the project system settings under the configuration for WBS elements.
- Adjust Project Structure: If you need to create a deeper hierarchy, consider restructuring your project to fit within the allowed levels. This may involve consolidating some elements or rethinking the project breakdown.
- Consult Documentation: Refer to SAP documentation or your organization's SAP guidelines to understand the limitations and best practices for project structuring.
- Contact SAP Support: If you believe the configuration needs to be changed to accommodate your project requirements, you may need to contact your SAP administrator or support team to discuss potential adjustments to the system settings.
Related Information:
By following these steps, you should be able to resolve the CJ437 error and successfully manage your project structures within SAP.
Get instant SAP help. Start your 7-day free trial now.
CJ436
Do not enter a level smaller than &
What causes this issue? In the WBS element overview there is an element at level &V1& which follows the WBS element you just created. You can...
CJ435
Enter new WBS elements only under the initial element
What causes this issue? You are working with only a portion of the work breakdown structure. In this case, you can only create new WBS elements at a ...
CJ440
Subproject assignment & not allowed - You cannot save
What causes this issue? You have assigned subprojekts to WBS elements. You cannot assign WBS element &V1&. The WBS element &V2& is al...
CJ441
Process the subproject assignment completely
What causes this issue? You have assigned individual WBS elements to subprojects; however, you must assign <ZH>each</> WBS element to a s...
Click on this link to search all SAP messages.