Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 429
Message text: Element not further subdivided
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ429
- Element not further subdivided ?The SAP error message CJ429 "Element not further subdivided" typically occurs in the context of project management and controlling within SAP, particularly when dealing with Work Breakdown Structures (WBS) or project elements. This error indicates that the system expects a certain level of detail or subdivision for a project element, but it has not been provided.
Cause:
- WBS Structure: The error often arises when you are trying to assign costs, resources, or other elements to a WBS element that is not further subdivided. This means that the WBS element is at the lowest level of detail, and you cannot break it down any further.
- Missing Sub-elements: If you are trying to perform an action that requires sub-elements (like assigning costs or resources), and those sub-elements do not exist, this error will be triggered.
- Incorrect Configuration: Sometimes, the configuration of the project structure may not allow for further subdivisions due to settings in the project profile or WBS settings.
Solution:
- Check WBS Structure: Review the WBS structure to ensure that you are working with the correct level of detail. If you need to assign costs or resources, ensure that you are doing so at a WBS element that has sub-elements.
- Create Sub-elements: If necessary, create additional WBS elements or sub-elements under the current WBS element to allow for further subdivisions. This can be done through the project management transaction codes (like CJ20N).
- Review Project Profile: Check the project profile settings to ensure that they allow for the desired level of detail. You may need to adjust the settings to enable further subdivisions.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing WBS elements and project structures.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ428
Right limit of hierarchy level reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ427
Left limit of hierarchy level reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ430
Navigation not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ435
Enter new WBS elements only under the initial element
What causes this issue? You are working with only a portion of the work breakdown structure. In this case, you can only create new WBS elements at a ...