How To Fix CJ238 - Profit center of WBS & is not same as the profit center of activity & &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 238

  • Message text: Profit center of WBS & is not same as the profit center of activity & &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ238 - Profit center of WBS & is not same as the profit center of activity & & ?

    The SAP error message CJ238 indicates a mismatch between the profit center assigned to a Work Breakdown Structure (WBS) element and the profit center assigned to an activity. This error typically occurs during the assignment of costs or when trying to post transactions related to a project.

    Cause:

    1. Profit Center Mismatch: The primary cause of this error is that the WBS element and the activity are assigned to different profit centers. In SAP, each WBS element and activity must be associated with the same profit center for cost allocation and reporting purposes.
    2. Configuration Issues: There may be configuration issues in the project system or controlling module that lead to this mismatch.
    3. Data Entry Errors: Incorrect data entry during the creation of WBS elements or activities can also lead to this error.

    Solution:

    1. Check Profit Center Assignments:

      • Go to the WBS element in question and check its profit center assignment. You can do this by navigating to the WBS element in the Project System (transaction code CJ03).
      • Similarly, check the profit center assigned to the activity (transaction code CJ20N or through the activity details in the project).
    2. Align Profit Centers:

      • If you find that the profit centers are different, you will need to either change the profit center of the WBS element or the activity to ensure they match.
      • This can typically be done in the project definition or by editing the WBS element or activity directly.
    3. Review Configuration:

      • If the issue persists, review the configuration settings in the Project System and Controlling modules to ensure that they are set up correctly.
      • Check if there are any specific settings that enforce profit center consistency.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on managing profit centers in project systems.
    5. Seek Help from SAP Support:

      • If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.

    Related Information:

    • Transaction Codes:
      • CJ03: Display WBS Element
      • CJ20N: Project Builder
      • CJ02: Change WBS Element
    • Profit Center Accounting: Understanding how profit centers work in SAP and their role in project accounting can help prevent such errors in the future.
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.

    By ensuring that the profit centers for both the WBS element and the activity are aligned, you should be able to resolve the CJ238 error and proceed with your project-related transactions.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker