  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ209 - Not all project types are assigned to project profile &1 ?

    The SAP error message CJ209 indicates that not all project types are assigned to the specified project profile. This error typically occurs when you are trying to create or manage a project in SAP Project System (PS) and the system cannot find a complete mapping of project types to the project profile you are using.

    Cause:

    1. Missing Assignments: The project profile you are trying to use does not have all the necessary project types assigned to it. This can happen if the project profile was not configured correctly or if certain project types were added after the profile was created.
    2. Configuration Issues: There may be issues in the configuration settings of the project profiles and project types in the SAP system.
    3. Custom Development: If there are custom developments or modifications in the project system, they might lead to inconsistencies in the project profile settings.

    Solution:

    To resolve the CJ209 error, you can follow these steps:

    1. Check Project Profile Configuration:

      • Go to the transaction code OPRJ (Project Profile) in SAP.
      • Select the project profile that is causing the error.
      • Verify the assigned project types. Ensure that all necessary project types are included in the profile.
    2. Assign Missing Project Types:

      • If you find that certain project types are missing, you can add them to the project profile.
      • Make sure to save your changes after updating the project profile.
    3. Review Project Type Configuration:

      • Use transaction code OPRJ to check the configuration of the project types.
      • Ensure that the project types are correctly defined and that they are compatible with the project profile.
    4. Consult Documentation:

      • Review SAP documentation or help files related to project profiles and project types for additional guidance on configuration.
    5. Testing:

      • After making the necessary changes, try to create or manage the project again to see if the error persists.
    6. Consult with SAP Support:

      • If the issue continues after checking the configurations, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes:
      • CJ01: Create Work Breakdown Structure (WBS)
      • CJ02: Change WBS
      • CJ03: Display WBS
      • OPRJ: Project Profile Configuration
    • SAP Notes: Check for any relevant SAP Notes that might address known issues or provide additional guidance on this error.
    • Documentation: Review the SAP Project System documentation for best practices in configuring project profiles and types.

    By following these steps, you should be able to resolve the CJ209 error and successfully manage your projects in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author