Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 159
Message text: Project object "&" cannot be changed due to status
This action cannot be executed for <DS:GLOS.project object>project
objects</> with the status 'Deleteion flag activated', 'Closed' or
'Technically completed'.
Check the system status or the user status for the project object on the
details screen. Refer to the SAP Library for the Project System under
<ls>Status management</> for details about which business transactions
are allowed or forbidden for each status.
Error message extract from SAP system. Copyright SAP SE.
CJ159
- Project object "&" cannot be changed due to status ?The SAP error message CJ159 indicates that a project object (in this case, represented by "&") cannot be changed due to its current status. This typically occurs in the Project System (PS) module when you attempt to modify a project that is in a status that does not allow changes.
Cause:
The error is usually caused by one of the following reasons:
- Project Status: The project is in a status that restricts changes. For example, if the project is completed, closed, or has been set to a status that prevents modifications.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the project.
- Locked Objects: The project or its components may be locked by another user or process.
Solution:
To resolve the CJ159 error, you can take the following steps:
Check Project Status:
- Navigate to the project in question and check its status. You can do this by using transaction code CJ20N (Project Builder) or CJ03 (Display Project).
- If the project is in a status that does not allow changes (like "Completed" or "Closed"), you may need to change the status back to a modifiable state. This can be done using transaction CJ02 (Change Project) if you have the necessary permissions.
Change Project Status:
- If you have the necessary permissions, you can change the project status to allow modifications. This may involve setting the project to "In Process" or another appropriate status.
Check Authorizations:
- Ensure that you have the required authorizations to modify the project. You may need to contact your SAP security team to verify your access rights.
Unlock Objects:
- If the project is locked, you may need to check with your colleagues or system administrator to see if someone else is currently working on it. If necessary, you can use transaction SM12 to view and manage locked entries.
Consult Documentation:
- Review the project documentation or consult with your project manager to understand the implications of changing the project status.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ158
Constraint & not valid
What causes this issue? You are attempting to create time constraints for an activity, however constraint &V1& is not allowed in this case.Ho...
CJ157
WBS element & cannot be costed
What causes this issue? The activity or activities which the system uses to cost WBS element &V1& are currently locked by another user.How to...
CJ160
Only the first 32 periods are displayed
What causes this issue? The system can display capacity loads over a maximum of 32 periods. The current number of periods is too large. The system is...
CJ161
Activity cannot be scheduled. Control key does not allow scheduling
What causes this issue? The activity was not scheduled because the control key for this activity does not permit scheduling.System Response INCLUDE ...