How To Fix CJ136 - Date for the time line must be on the time axis


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 136

  • Message text: Date for the time line must be on the time axis

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ136 - Date for the time line must be on the time axis ?
    The SAP error message CJ136 ("Date for the time line must be on the time axis") typically occurs in the context of project management within SAP, particularly when dealing with project planning and scheduling in the Project System (PS) module. This error indicates that the date you are trying to enter or modify does not align with the defined time axis for the project.
    
    Cause: Date Misalignment: The date you are trying to enter is outside the defined time frame of the project. This could happen if the date is before the project start date or after the project end date. Incorrect Time Axis Settings: The time axis settings for the project may not be configured correctly, leading to discrepancies in the expected date range. Project Status: The project might be in a status that does not allow changes to the timeline, such as being locked or completed.
    Solution: Check Project Dates: Verify the start and

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant