Do you have any question about this error?
Message type: E = Error
Message class: CFV - Message Class for Production Versions
Message number: 056
Message text: You cannot generate BOM &1; see long text
The <DS:GLOS.3526C3F9AFAB52B9E10000009B38F974>bill of material (BOM)</>
you selected is subject to
<DS:GLOS.3526BEE3AFAB52B9E10000009B38F974>engineering change management
</>. The entry in the change master record that is necessary to generate
the BOM is missing.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Maintain the relevant entries in the change master record for BOM &V1&.
Error message extract from SAP system. Copyright SAP SE.
CFV056
- You cannot generate BOM &1; see long text ?The SAP error message CFV056, which states "You cannot generate BOM &1; see long text," typically occurs when there is an issue with the creation or generation of a Bill of Materials (BOM) in the SAP system. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.
Possible Causes:
- Missing Master Data: The material for which you are trying to create a BOM may not have the necessary master data set up, such as material type or status.
- Incorrect BOM Usage: The BOM usage specified may not be valid for the material or may not be allowed in the current context.
- Authorization Issues: The user may not have the necessary authorizations to create or modify BOMs.
- Configuration Issues: There may be configuration settings in the system that prevent the generation of BOMs for certain materials or under certain conditions.
- Status of the Material: The material may be in a status that does not allow BOM creation (e.g., blocked or inactive).
- Existing BOM Conflicts: There may be existing BOMs that conflict with the new BOM you are trying to create.
Solutions:
- Check Master Data: Ensure that all necessary master data for the material is correctly set up. This includes checking the material type, status, and any other relevant data.
- Review BOM Usage: Verify that the BOM usage you are trying to use is valid for the material in question. You can check the allowed usages in the BOM configuration.
- Authorization Check: Ensure that the user has the necessary authorizations to create or modify BOMs. This may involve checking user roles and permissions.
- Configuration Review: Consult with your SAP configuration team to review the settings related to BOM generation. Ensure that there are no restrictions in place that would prevent BOM creation.
- Material Status: Check the status of the material. If it is blocked or inactive, you may need to change its status to allow BOM creation.
- Conflict Resolution: If there are existing BOMs that conflict with the new one, you may need to resolve these conflicts by either modifying or deleting the existing BOMs.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
CFV055
You cannot change detailed plan &1 &2; approval is missing
What causes this issue? You want to maintain a different <DS:GLOS.3526C4FCAFAB52B9E10000009B38F974>master recipe</> for the detailed plan...
CFV054
Valid-from date is set to current date and valid-to is set to maximum
What causes this issue? You have not entered data for the validity period of the <DS:GLOS.3526C38DAFAB52B9E10000009B38F974>production version&l...
CFV057
Enter a short text for the production version
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CFV058
Production version &1 for &2 was deleted by a different user
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.