Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 118
Message text: Scheduling has not yet been carried out
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7118
- Scheduling has not yet been carried out ?The SAP error message C7118, which states "Scheduling has not yet been carried out," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system has not yet performed the scheduling process for a particular order or operation, which is necessary for determining the start and finish dates of production activities.
Causes:
- Missing Scheduling Step: The scheduling process has not been executed for the production order or planned order.
- Incorrect Order Status: The order may be in a status that does not allow scheduling (e.g., "Created" status).
- Configuration Issues: There may be issues with the configuration of the production planning module or the specific order type.
- Missing Data: Required data for scheduling (like routing, work center, or capacity) may be missing or incorrectly maintained.
- User Authorization: The user may not have the necessary authorizations to perform scheduling.
Solutions:
Execute Scheduling:
- Go to the transaction code for scheduling (e.g., CO02 for production orders) and manually execute the scheduling process.
- You can also use the transaction code
MD02
for planned orders to perform scheduling.Check Order Status:
- Ensure that the order is in a status that allows scheduling. If it is not, you may need to change the status or complete any prerequisite steps.
Review Configuration:
- Check the configuration settings for the production order type and ensure that all necessary parameters for scheduling are correctly set up.
Verify Data:
- Ensure that all required master data (like routing, work centers, and production resources) is correctly maintained and available for the order.
User Authorization:
- Check if the user has the necessary authorizations to perform scheduling. If not, contact your SAP security administrator to grant the required permissions.
Consult Documentation:
- Review SAP documentation or help files related to production planning and scheduling for additional insights and troubleshooting steps.
Related Information:
By following these steps, you should be able to resolve the C7118 error and successfully carry out the scheduling process in SAP.
Get instant SAP help. Start your 7-day free trial now.
C7112
Dependency is too complicated; routing & , sequence & , operation &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7111
Check if rate-based scheduling is appropriate -> see long text
What causes this issue? You are attempting to set the <ZH>scheduling</> and/or <ZH>capacity planning</> indicators for severa...
C7119
Scheduling log does not contain any entries
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7120
Outline finish date could not be kept
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.