Message type: E = Error
Message class: C7 - Scheduling
Message number: 084
Message text: WBS element &1: Scheduled finish comes after the basic finish date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7084
- WBS element &1: Scheduled finish comes after the basic finish date ?The SAP error message C7084 indicates that there is a scheduling issue with a Work Breakdown Structure (WBS) element. Specifically, it means that the scheduled finish date for a task or activity is set to a date that is later than the basic finish date defined for that WBS element. This can lead to inconsistencies in project planning and reporting.
Cause:
- Incorrect Scheduling: The scheduled finish date may have been entered incorrectly, either manually or through a scheduling tool.
- Changes in Project Plan: If there have been changes to the project plan, such as delays or rescheduling of tasks, the scheduled finish date may not have been updated accordingly.
- Dependencies and Constraints: The task may have dependencies or constraints that were not properly accounted for, leading to a situation where the finish date exceeds the basic finish date.
- Data Entry Errors: Simple data entry mistakes can also lead to this error, such as entering the wrong date format or selecting the wrong WBS element.
Solution:
- Review Scheduled Dates: Check the scheduled finish date for the WBS element in question. Ensure that it is set to a date that is on or before the basic finish date.
- Update Dates: If the scheduled finish date is incorrect, update it to reflect a valid date that complies with the project timeline.
- Check Dependencies: Review any dependencies or constraints associated with the WBS element. Make sure that they are correctly set and that they do not conflict with the scheduled finish date.
- Consult Project Plan: If there have been recent changes to the project plan, consult the latest version to ensure that all dates are aligned and accurate.
- Use Scheduling Tools: If applicable, use SAP's scheduling tools to automatically adjust dates based on project progress and dependencies.
Related Information:
By addressing the scheduling issue and ensuring that all dates are correctly aligned, you can resolve the C7084 error and maintain the integrity of your project plan.
Get instant SAP help. Start your 7-day free trial now.
C7083
WBS element &1: Scheduled start comes before the basic start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7082
Time units exist that are smaller and larger/equal to the day
What causes this issue? You have defined time units smaller and larger/equal to DAY as the default values.System Response All operation time segment...
C7085
Repetitive maufacturing: Midpoint sched. around work center &1 not poss.
What causes this issue? In the planning table for repetitive manufacturing, you are working with midpoint scheduling based on the "planning oper...
C7086
In-house production time determined is greater than 999 days
What causes this issue? During scheduling, an inhouse production time greater than 999 days was calculated.System Response The system uses a maximum...