Message type: E = Error
Message class: C7 - Scheduling
Message number: 083
Message text: WBS element &1: Scheduled start comes before the basic start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7083
- WBS element &1: Scheduled start comes before the basic start date ?The SAP error message C7083 indicates that there is a scheduling issue with a Work Breakdown Structure (WBS) element. Specifically, it means that the scheduled start date for a task or activity is set to a date that is earlier than the basic start date defined for that WBS element. This can occur during project planning or when trying to schedule activities in SAP Project System (PS).
Cause:
- Incorrect Date Settings: The scheduled start date for the task is manually set to a date that is before the basic start date of the WBS element.
- Dependencies and Constraints: There may be dependencies or constraints that have not been properly configured, leading to scheduling conflicts.
- Data Entry Errors: Mistakes during data entry can lead to incorrect date assignments.
- Changes in Project Plan: If the project plan has been modified (e.g., rescheduling), it may result in inconsistencies between the scheduled and basic dates.
Solution:
- Check Dates: Review the scheduled start date and the basic start date of the WBS element. Ensure that the scheduled start date is on or after the basic start date.
- Adjust Scheduling: If the scheduled start date is incorrect, adjust it to a valid date that complies with the basic start date.
- Review Dependencies: Check for any dependencies or constraints that may affect the scheduling of the WBS element. Adjust them as necessary.
- Re-evaluate Project Plan: If there have been recent changes to the project plan, ensure that all related dates are consistent and correctly aligned.
- Use Project Planning Tools: Utilize SAP's project planning tools to visualize the project timeline and identify any discrepancies in scheduling.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to view and edit WBS elements and their scheduling details.By following these steps, you should be able to resolve the C7083 error and ensure that your project scheduling is accurate and compliant with the defined parameters.
Get instant SAP help. Sign up for our Free Essentials Plan.
C7082
Time units exist that are smaller and larger/equal to the day
What causes this issue? You have defined time units smaller and larger/equal to DAY as the default values.System Response All operation time segment...
C7081
Program CX_TCX00 executed with a warning
What causes this issue? The program CX_TCX00 has finished succesfully. There are entries in the scheduling tables with the same key fields. These ent...
C7084
WBS element &1: Scheduled finish comes after the basic finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7085
Repetitive maufacturing: Midpoint sched. around work center &1 not poss.
What causes this issue? In the planning table for repetitive manufacturing, you are working with midpoint scheduling based on the "planning oper...
Click on this link to search all SAP messages.