Message type: E = Error
Message class: C7 - Scheduling
Message number: 068
Message text: Can delivery date for material & be kept? Realistic date: &
The date is the delivery date taking int account
<GL:planned_delivery_time>planned delivery time</> in the
<GL:material_master>material master</>
purchasing department processing time from table 399D
goods receipt processing time in the material master or in the item
INCLUDE NA_T160M
You can change the delivery date specified and enter a realistic
delivery date &V2&.
Error message extract from SAP system. Copyright SAP SE.
C7068
- Can delivery date for material & be kept? Realistic date: & ?The SAP error message C7068 indicates that there is an issue with the delivery date for a material in a sales order or delivery. The message typically arises when the requested delivery date cannot be met based on the current stock levels, production schedules, or other constraints in the system.
Cause:
- Stock Availability: The material may not be available in the required quantity by the requested delivery date.
- Production Lead Time: If the material needs to be produced, the production lead time may exceed the requested delivery date.
- Transportation Constraints: There may be issues related to transportation that prevent the material from being delivered on time.
- Planning Parameters: Incorrect planning parameters or settings in the material master or sales order may lead to unrealistic delivery dates.
- Sales Order Configuration: The configuration of the sales order may not allow for the requested delivery date due to various constraints.
Solution:
- Check Stock Levels: Verify the current stock levels of the material in question. If stock is insufficient, consider adjusting the delivery date to a later time when stock will be available.
- Review Production Schedule: If the material needs to be produced, check the production schedule and lead times. Adjust the delivery date accordingly.
- Adjust Delivery Date: If the requested delivery date is unrealistic, change it to a date that aligns with stock availability and production capabilities.
- Check Transportation: Ensure that there are no transportation issues that could affect the delivery date. Coordinate with logistics if necessary.
- Review Material Master Data: Check the material master data for any incorrect settings that may affect delivery dates, such as lead times, safety stock levels, and planning parameters.
- Consult with Planning Team: If necessary, consult with the planning or production team to understand any constraints that may be affecting the delivery date.
Related Information:
MD04
(Stock/Requirements List) to check stock levels and CO09
(Availability Overview) to analyze availability for the material.MM03
to check lead times and other relevant settings.VA03
to view the sales order and check the requested delivery date and any related constraints.CO03
to see if there are any scheduled production runs that could affect availability.By following these steps, you should be able to identify the cause of the error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
C7067
Not all standard values maintained
What causes this issue? You have not maintained all standard values in the operation.How to fix this error? Maintain the standard values in the oper...
C7066
Error during scheduling of splits
What causes this issue? An error occurred when attempting to schedule a split of an operation. The cause of the error may be that a person is not ava...
C7069
PRT: no master record found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7070
Relationship: Maximum duration could not be kept
What causes this issue? A maximum duration has been entered for the relationship between order &V1&, operation &V2& and order &V3...