Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 039
Message text: Cannot keep within time constraint
When carrying out scheduling, the system could not keep the time
constraint which you entered for the activity.
Given this situation, if you carry out backward scheduling, you will
get a negative total float.
Check the time constraints entered for the activity.
Check the basic dates for the network in the network header.
Error message extract from SAP system. Copyright SAP SE.
C7039
- Cannot keep within time constraint ?The SAP error message C7039, "Cannot keep within time constraint," typically occurs in the context of scheduling or planning within SAP systems, particularly in production planning (PP) or project systems (PS). This error indicates that the system is unable to meet the specified time constraints for a particular operation, task, or process.
Causes:
- Resource Availability: The resources (machines, labor, etc.) required for the operation may not be available within the specified time frame.
- Capacity Constraints: The production capacity may be insufficient to meet the demand within the required time.
- Scheduling Conflicts: There may be overlapping tasks or operations that prevent the system from scheduling the operation within the desired time.
- Incorrect Time Settings: The time settings for the operation, such as lead times, setup times, or processing times, may be incorrectly configured.
- Dependencies: There may be dependencies on other tasks or operations that are not being met, causing delays.
Solutions:
- Check Resource Availability: Ensure that the necessary resources are available and not overbooked. You may need to adjust the schedule or allocate additional resources.
- Adjust Capacity Planning: Review and adjust the capacity planning settings to ensure that there is enough capacity to meet the demand.
- Review Scheduling Parameters: Check the scheduling parameters and settings in the system to ensure they are correctly configured.
- Modify Time Constraints: If possible, consider modifying the time constraints for the operation to allow for more flexibility.
- Analyze Dependencies: Review the dependencies between tasks and ensure that all prerequisites are met before scheduling the operation.
- Use Alternative Scheduling Techniques: If the standard scheduling methods are not working, consider using alternative scheduling techniques or tools available in SAP.
Related Information:
CM01
(Capacity Planning), C223
(Change Work Center), or C202
(Change Production Order) to analyze and adjust settings related to the error.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP PP or PS modules for further assistance.
Get instant SAP help. Start your 7-day free trial now.
C7038
Schedule conflict: Constraint is too late
What causes this issue? You have maintained a date constraint for the end of the activity. Backward scheduling has determined a latest date which is ...
C7037
Schedule conflict: Constraint is too early
What causes this issue? The system has carried out forward scheduling and has calculated an earliest date either which is after the time constraint f...
C7040
Schedule conflict: Contradicting time constraints
What causes this issue? You have entered time contraints for the activity that have caused discrepancies in scheduling. The reasons could include: Th...
C7041
No work center in the relationship (Operating time via calender from rel)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.