Message type: E = Error
Message class: C7 - Scheduling
Message number: 033
Message text: Constraint is before basic start date
The constraint that you entered for the activity is before the
specified basic start date.
INCLUDE 'NA_ALLG_MOEGLICH' OBJECT DOKU ID TX
Check the date constraint for the activity.
Check the basic dates of the network in the network header.
Error message extract from SAP system. Copyright SAP SE.
C7033
- Constraint is before basic start date ?The SAP error message C7033, which states "Constraint is before basic start date," typically occurs in the context of project management or production planning within SAP. This error indicates that a constraint (such as a start date or finish date) has been set earlier than the basic start date of the project or task, which is not allowed.
Cause:
- Incorrect Date Entry: The most common cause is that the user has entered a constraint date that is earlier than the basic start date of the project or task.
- Project Structure Changes: Changes in the project structure or scheduling that have not been properly updated can lead to this error.
- Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in date entries.
Solution:
- Check Dates: Review the constraint dates and the basic start date of the project or task. Ensure that all constraints are set to dates that are equal to or later than the basic start date.
- Adjust Constraints: If a constraint is found to be incorrectly set, adjust it to a valid date that complies with the basic start date.
- Review Project Settings: Ensure that the project settings and parameters are correctly configured, and that there are no conflicting entries.
- Use Transaction Codes: You can use transaction codes like
CJ20N
(Project Builder) orCProject
to review and adjust project constraints and dates.- Consult Documentation: Refer to SAP documentation or help files for specific guidance on managing constraints and dates in your version of SAP.
Related Information:
By following these steps, you should be able to resolve the C7033 error and ensure that your project constraints are correctly aligned with the basic start date.
Get instant SAP help. Start your 7-day free trial now.
C7032
Scheduling terminated: Scheduling parameters are missing
What causes this issue? No scheduling parameters have been maintained in customizing.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJE...
C7031
Control key & not found
What causes this issue? The control key that you maintained in the operation does not exist. The system issues an error message and will not allow yo...
C7034
Constraint is after basic finish date
What causes this issue? The constraint that you entered for the activity is after the specified basic finish date.How to fix this error? INCLUDE ...
C7035
Scheduled start is before basic start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.