How To Fix C7033 - Constraint is before basic start date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 033

  • Message text: Constraint is before basic start date

  • Show details Hide details
  • What causes this issue?

    The constraint that you entered for the activity is before the
    specified basic start date.

    How to fix this error?

    INCLUDE 'NA_ALLG_MOEGLICH' OBJECT DOKU ID TX
    Check the date constraint for the activity.
    Check the basic dates of the network in the network header.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C7033 - Constraint is before basic start date ?

    The SAP error message C7033, which states "Constraint is before basic start date," typically occurs in the context of project management or production planning within SAP. This error indicates that a constraint (such as a start date or finish date) has been set earlier than the basic start date of the project or task, which is not allowed.

    Cause:

    1. Incorrect Date Entry: The most common cause is that the user has entered a constraint date that is earlier than the basic start date of the project or task.
    2. Project Structure Changes: Changes in the project structure or scheduling that have not been properly updated can lead to this error.
    3. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in date entries.

    Solution:

    1. Check Dates: Review the constraint dates and the basic start date of the project or task. Ensure that all constraints are set to dates that are equal to or later than the basic start date.
    2. Adjust Constraints: If a constraint is found to be incorrectly set, adjust it to a valid date that complies with the basic start date.
    3. Review Project Settings: Ensure that the project settings and parameters are correctly configured, and that there are no conflicting entries.
    4. Use Transaction Codes: You can use transaction codes like CJ20N (Project Builder) or CProject to review and adjust project constraints and dates.
    5. Consult Documentation: Refer to SAP documentation or help files for specific guidance on managing constraints and dates in your version of SAP.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • User Roles and Permissions: Ensure that the user has the necessary permissions to make changes to project dates and constraints.
    • Training and Support: If the issue persists, consider reaching out to your SAP support team or consulting with a professional who specializes in SAP project management.

    By following these steps, you should be able to resolve the C7033 error and ensure that your project constraints are correctly aligned with the basic start date.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author