Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 026
Message text: Scheduling type not defined, scheduling type = "only capacity reqmts"
The key that you have entered for the scheduling type does not exist.
Scheduling is carried out using the scheduling type "no scheduling".
The system writes the basic dates into the operations.
INCLUDE 'NA_ALLG_SYSTEMVERW' OBJECT DOKU ID TX
Check whether the key is defined for the scheduling type and define it,
if necessary.
<DS:TRAN.OPJN>Proceed</>
ENDIF
Error message extract from SAP system. Copyright SAP SE.
C7026
- Scheduling type not defined, scheduling type = "only capacity reqmts" ?The SAP error message C7026, which states "Scheduling type not defined, scheduling type = 'only capacity reqmts'," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is trying to use a scheduling type that has not been defined in the configuration.
Cause:
The error is usually caused by one of the following reasons:
- Missing Configuration: The scheduling type "only capacity requirements" has not been defined in the system settings.
- Incorrect Settings: The settings for the scheduling type may be incorrectly configured or not aligned with the requirements of the production process.
- Master Data Issues: The material master or routing may not have the necessary scheduling type defined.
Solution:
To resolve the error, you can take the following steps:
Check Scheduling Type Configuration:
- Go to the configuration settings in SAP (Transaction SPRO).
- Navigate to the relevant area for production planning and check the settings for scheduling types.
- Ensure that the scheduling type "only capacity requirements" is defined and properly configured.
Define Scheduling Type:
- If the scheduling type is not defined, you may need to create it. This can typically be done in the configuration settings under the production planning module.
- Ensure that all necessary parameters for the scheduling type are set correctly.
Review Master Data:
- Check the material master data and routing for the relevant materials to ensure that they are set up correctly.
- Make sure that the scheduling type is assigned to the relevant production orders or operations.
Consult Documentation:
- Review SAP documentation or help resources for more detailed information on scheduling types and their configurations.
Testing:
- After making the necessary changes, test the process again to ensure that the error no longer occurs.
Related Information:
C223
(for defining scheduling types) or C201
(for creating production orders) to navigate to the relevant areas.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP production planning.
Get instant SAP help. Start your 7-day free trial now.
C7025
Scheduled start is after scheduled finish
What causes this issue? An internal error occurred.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix this error...
C7024
Field overflow when calculating duration
What causes this issue? An internal error occurred.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix this error...
C7027
Quantity unit of the operation/activity is invalid
What causes this issue? The quantity unit that you have maintained in the operation does not exist.System Response INCLUDE 'NA_ALLG_NOVERARBEIT...
C7028
No work center or calender in operation/activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...