Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 024
Message text: Field overflow when calculating duration
An internal error occurred.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_SYSTEMVERW' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
C7024
- Field overflow when calculating duration ?The SAP error message C7024, which indicates a "Field overflow when calculating duration," typically occurs when the system attempts to perform a calculation involving time durations that exceed the allowable limits for the data type being used. This can happen in various contexts, such as project management, scheduling, or any other module that involves time calculations.
Causes:
Excessive Duration Values: The most common cause is that the duration being calculated exceeds the maximum value that can be stored in the relevant field. For example, if the system is trying to calculate a duration that results in a value greater than what can be represented in the database field (e.g., exceeding the maximum number of hours or days).
Incorrect Data Entry: User input errors, such as entering an incorrect start or end date, can lead to calculations that result in an overflow.
Configuration Issues: In some cases, the configuration settings for time-related fields may not be set up correctly, leading to unexpected results during calculations.
System Bugs: Occasionally, there may be bugs in the SAP system or specific transactions that can lead to this error.
Solutions:
Check Duration Values: Review the values being used in the calculation. Ensure that the start and end dates/times are correct and that the resulting duration does not exceed the limits of the field.
Adjust Data Entry: If the error is due to incorrect data entry, correct the input values. Ensure that the dates and times are entered in the correct format and within reasonable limits.
Review Configuration: Check the configuration settings related to time and duration calculations in the relevant module. Ensure that they are set up correctly to handle the expected range of values.
Use Alternative Calculations: If the duration calculation is consistently leading to overflow errors, consider breaking down the calculation into smaller parts or using alternative methods to achieve the desired result.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes or patches that may address this specific error. There may be known issues or updates that can resolve the problem.
Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP Support for further assistance. They may provide insights or solutions specific to your system configuration.
Related Information:
By following these steps, you should be able to identify the cause of the C7024 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
C7023
Error when converting into other quantity units
What causes this issue? An internal error occured when converting units of measure.System Response Scheduling is carried out using a quantity of zer...
C7022
Date cannot be converted into the internal format
What causes this issue? An internal error occurred when converting the date.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU I...
C7025
Scheduled start is after scheduled finish
What causes this issue? An internal error occurred.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix this error...
C7026
Scheduling type not defined, scheduling type = "only capacity reqmts"
What causes this issue? The key that you have entered for the scheduling type does not exist.System Response Scheduling is carried out using the sch...
Click on this link to search all SAP messages.