Do you have any question about this error?
Message type: E = Error
Message class: C5 - Master Recipe
Message number: 814
Message text: Select a phase
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C5814
- Select a phase ?The SAP error message C5814, which states "Select a phase," typically occurs in the context of project management or project system modules within SAP. This error indicates that the system requires the user to select a specific phase in a project or process, but none has been selected.
Cause:
- Missing Phase Selection: The user has not selected a project phase when trying to perform an action that requires one.
- Configuration Issues: The project structure may not be properly configured, leading to the absence of available phases.
- Authorization Issues: The user may not have the necessary permissions to view or select phases in the project.
Solution:
- Select a Phase: Ensure that you select a valid project phase from the available options before proceeding with the action that triggered the error.
- Check Project Configuration: Verify that the project is correctly set up and that phases are defined in the project structure. You may need to consult with a project manager or SAP administrator to ensure that the project phases are correctly configured.
- Review Authorizations: Check if you have the necessary authorizations to access and select project phases. If not, contact your SAP security administrator to request the appropriate permissions.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the project management module you are using, as the steps may vary based on the version and configuration of your SAP system.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
C5813
You have reached the last phase selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C5812
You have reached the first phase selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C5815
& process instruction characteristics deleted
What causes this issue? When creating, changing or deleting process instructions within recipe maintenance, the process instruction characteristics a...
C5816
& process instruction characteristics created
What causes this issue? When creating, changing or deleting process instructions in master recipe maintenance, the process instruction characteristic...
Click on this link to search all SAP messages.