Do you have any question about this error?
Message type: E = Error
Message class: C5 - Master Recipe
Message number: 765
Message text: Check the standard values for the phase
You changed the resources of an operation. The resources for this
operation are automatically copied to the phases. These resources are
also automatically copied to phases you have just created.
Update the standard values of the phases which are affected by
changed operation resources.
Error message extract from SAP system. Copyright SAP SE.
C5765
- Check the standard values for the phase ?The SAP error message C5765, which states "Check the standard values for the phase," typically occurs in the context of production planning or project management within SAP. This error is related to the configuration of standard values for phases in a project or production order.
Cause:
- Missing Standard Values: The error often arises when there are no standard values defined for a specific phase in the project or production order. This can happen if the configuration is incomplete or if the standard values have not been maintained properly.
- Incorrect Configuration: If the standard values are incorrectly configured or if there are inconsistencies in the data, this error may also be triggered.
- Phase Not Defined: The phase in question may not be defined in the system, leading to the inability to retrieve standard values.
Solution:
Check Standard Values: Navigate to the relevant configuration settings in SAP and verify that standard values for the phase in question are defined. This can typically be done in the following way:
- Go to the transaction code related to the configuration of standard values (e.g., OPL8 for production orders).
- Check the settings for the specific phase and ensure that all necessary standard values are maintained.
Maintain Standard Values: If standard values are missing, you will need to create or update them. This involves:
- Defining the standard values for the relevant phase.
- Ensuring that all required fields are filled out correctly.
Review Phase Definitions: Ensure that the phase itself is correctly defined in the system. You may need to check the project or order type settings to confirm that the phase is valid.
Consult Documentation: If you are unsure about the correct values or settings, refer to SAP documentation or consult with a functional consultant who specializes in the relevant module (e.g., Project System, Production Planning).
Testing: After making changes, test the process again to ensure that the error has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with SAP support or your internal IT team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
C5764
Ctrl recipe destinations assigned to operations are deleted automatically
What causes this issue? You specified a control recipe destination when creating an operation. However, you can only assign control recipe destinatio...
C5763
Enter the number of the superior operation
What causes this issue? You set the phase indicator without entering the superior operation.How to fix this error? You can proceed in two ways: You ...
C5766
Control recipe destination & not found
What causes this issue? When you simulated or checked selected process instructions, the system could not read the data of control recipe destination...
C5767
Control recipe dest. & is not supported for a PI sheet
What causes this issue? You want to simulate or check a PI sheet. The phases or process instructions you have selected belong to a control recipe de...
Click on this link to search all SAP messages.