Message type: E = Error
Message class: C5 - Master Recipe
Message number: 762
Message text: The resource of a phase is automatically copied from the operation
You entered a resource when you created a phase. However, a phase
cannot have its own resources. The resources of the operation are
automatically copied to the phase.
Delete the resource you have entered for the phase.
Error message extract from SAP system. Copyright SAP SE.
C5762
- The resource of a phase is automatically copied from the operation ?The SAP error message C5762, which states "The resource of a phase is automatically copied from the operation," typically occurs in the context of production planning or project management within SAP. This message indicates that there is an issue with the assignment of resources to phases in a process or operation.
Cause:
- Resource Assignment: The error usually arises when a phase in a process is trying to assign a resource that is already defined at the operation level. SAP automatically copies the resource from the operation to the phase, and if there is a conflict or if the phase is not set up correctly, this error can occur.
- Configuration Issues: There may be configuration settings in the routing or work center that are not aligned with the phase definitions.
- Data Inconsistencies: There could be inconsistencies in the master data related to resources, operations, or phases.
Solution:
- Check Resource Assignment: Review the resource assignments for both the operation and the phase. Ensure that the phase does not have a conflicting resource assignment that would prevent the automatic copying from the operation.
- Review Configuration: Check the configuration settings for the routing and work center. Ensure that they are set up correctly and that there are no discrepancies between the operation and phase definitions.
- Adjust Phase Settings: If the phase is intended to have a different resource, you may need to adjust the settings to allow for this. This could involve changing the phase definition or the way resources are assigned.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling resource assignments in your version of SAP.
- Testing: After making changes, test the process to ensure that the error does not reoccur.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
C5761
& is a phase, enter the number of an operation
What causes this issue? You have entered the number of a phase as a superior operation.How to fix this error? Please specify the number of an operat...
C5760
Mark as a phase
What causes this issue? You have entered a superior operation without setting the phase indicator.How to fix this error? You can proceed in two ways...
C5763
Enter the number of the superior operation
What causes this issue? You set the phase indicator without entering the superior operation.How to fix this error? You can proceed in two ways: You ...
C5764
Ctrl recipe destinations assigned to operations are deleted automatically
What causes this issue? You specified a control recipe destination when creating an operation. However, you can only assign control recipe destinatio...
Click on this link to search all SAP messages.