Message type: E = Error
Message class: C5 - Master Recipe
Message number: 704
Message text: For operations, choose control key without external processing
You selected a control key for an operation which has an indicator set
for external processing. However, external processing can only be used
for phases and secondary resources.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Assign a control key to the operation which does not have an indicator
set for external processing.
Error message extract from SAP system. Copyright SAP SE.
C5704
- For operations, choose control key without external processing ?The SAP error message C5704 ("For operations, choose control key without external processing") typically occurs when you are trying to assign a control key to an operation in a routing or production order that is not compatible with external processing. This error is often related to the configuration of the control keys in the system.
Cause:
The error arises when:
- You are trying to use a control key that is designated for internal processing (i.e., operations that are performed within the company) for an operation that is intended for external processing (i.e., operations that are outsourced to a vendor).
- The control key you selected does not allow for external processing, which is typically indicated by the absence of certain flags in the control key configuration.
Solution:
To resolve this error, you can take the following steps:
Check Control Key Configuration:
- Go to the transaction code
OPL8
(orSPRO
-> Production -> Basic Data -> Routing -> Control Key) to review the configuration of the control key you are trying to use.- Ensure that the control key is set up to allow external processing if that is your intention. Look for settings related to external processing and adjust them as necessary.
Select an Appropriate Control Key:
- If the operation is indeed meant for external processing, select a control key that is specifically designed for that purpose. Common control keys that allow external processing include "PP01" (Production) or "PP02" (External Processing).
- If you are unsure which control key to use, consult with your SAP configuration team or refer to your organization's documentation on routing and control keys.
Review the Operation Type:
- Ensure that the operation type you are trying to assign is compatible with the control key you are using. Some operation types may have restrictions based on the control key.
Check for Customizations:
- If your organization has custom control keys or specific configurations, ensure that you are following the established guidelines for using those keys.
Testing:
- After making the necessary changes, try to create or modify the routing or production order again to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
C5703
Resource & is locked
What causes this issue? You entered a resource which is locked. You cannot use this resource to create a work order.How to fix this error? Enter a d...
C5702
Resource & is marked for deletion
What causes this issue? You entered a resource marked for deletion. You cannot use this resource to create a work order. The system issues an error m...
C5705
Resource & does not exist in plant &. Operation & was copied w/o resource
What causes this issue? The template you want to copy contains resource &V1& as the primary resource for operation &V3&. However, thi...
C5706
Control recipe destination & does not exist in plant & (phase &)
What causes this issue? The template you want to copy contains control recipe destination &V1&. However, this control recipe destination does...
Click on this link to search all SAP messages.